My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COMSTOCK
>
11781
>
2900 - Site Mitigation Program
>
PR0518364
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 4:52:37 PM
Creation date
6/14/2019 4:49:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518364
PE
2950
FACILITY_ID
FA0013868
FACILITY_NAME
KRETH PROPERTY
STREET_NUMBER
11781
Direction
E
STREET_NAME
COMSTOCK
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
11781 E COMSTOCK RD
P_LOCATION
01
P_DISTRICT
000
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Kreth Property <br /> Job Location: 11781 E. Comstock Rd, Stockton, CA <br /> Client Name: Fred Kreth <br /> Project Number: 02-486 <br /> General Work Description: Advance one to three soil borings to collect soil samples for the <br /> investigation of the current subsurface conditions. <br /> SSP Prepared by: Sean Garvey <br /> On-site Safety Officer: Sean Garvey <br /> Project Safety Officer: John Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP must be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site. <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors working <br /> for GZ4 at the job site. All personnel working for GZA at the job site must read this SSP, and sign <br /> the attached Compliance Agreement before entering the work area. Field personnel may deviate <br /> from the safety provisions set-forth in this SSP, but only to upgrade or increase the safety <br /> requirements. GZA personnel may suspend work if unsafe working conditions are identified or <br /> observed, or unauthorized modifications to the safety provisions set-forth in this SSP are made. If <br /> changes in site or working conditions require changes in safety procedures, appropriate <br /> amendments to this SSP will be provided by the GZA project manager or supervisor, with the <br /> written approval of the GZA Health and Safety Director. <br /> PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.