My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COMSTOCK
>
11781
>
2900 - Site Mitigation Program
>
PR0518364
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 4:52:37 PM
Creation date
6/14/2019 4:49:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518364
PE
2950
FACILITY_ID
FA0013868
FACILITY_NAME
KRETH PROPERTY
STREET_NUMBER
11781
Direction
E
STREET_NAME
COMSTOCK
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
11781 E COMSTOCK RD
P_LOCATION
01
P_DISTRICT
000
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> abdominal pain; dermatitis. <br /> 1 TPHg PEL 300 ppm Unknown if present Headache; nasal, eye, skin <br /> STEL 500 ppm and respiratory irritation, <br /> drowsiness, fatigue, <br /> pneumonitis, nausea, <br /> asphyxia, CNS depression. <br /> Physical Hazards <br /> Task(sll Hazart# Mlitigatio Measure <br /> 1,2 Heavy Equipment (Noise & Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in accordance <br /> with recognized industry standards and Cal- <br /> OSHA Title 8, Subchapter 4, Construction Safety <br /> Orders. In addition, an exclusion zone applies to <br /> all personnel. The exclusion zone will be 20 feet <br /> to the front and either side of the operating drill <br /> rig. Personnel will not be allowed under booms or <br /> augers at any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection. <br /> 1,2 Dust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of drilling <br /> and excavation activity. In addition, water will <br /> be applied to control the dust if visible levels of <br /> dust are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these <br /> materials. <br /> Flammable IFlash Poir t 100 °F? '< . Combustible (Flash Point <200'OF) <br /> Gasoline <br /> PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.