My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:17:21 AM
Creation date
6/18/2019 10:32:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA-Environmental ProtectioRgency • PETE WILSON Govemor <br /> CALIi ORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION D OF <br /> WRoutier Road,Suite A <br /> ramento,CA 95827-3098 -- <br /> PHONE:(916)255-3000 <br /> FAX:(916)255-3015 <br /> JUN <br /> 14, 1995 <br /> ENVIRONMENTAL HEALTH <br /> 12 June Y995 PERMIT/SERVICES <br /> Mr. Thomas Danaher <br /> Santa Fe Pacific Pipeline Partners, L.P. <br /> 888 South Figueroa Street <br /> Los Angeles, CA 90017 <br /> QUARTERLY GROUND WATER MONITORING REPORT, SANTA FE PACIFIC PIPELINE <br /> LEAK SITE, HOLT, SAN JOAQUIN COUNTY <br /> I have reviewed the 30 May 1995 Quarterly Ground Water Monitoring Report prepared by Terra <br /> Services for the Holt site. Quarterly reports for the site have been consistently late for the last few <br /> quarters. Monitoring and Reporting Program (MRP) No. 94-806 requires quarterly reports to be <br /> submitted by the 30th day of the month following the end of each quarter. Please make an effort to <br /> submit the reports on time. <br /> The quarterly report did not include the results of ongoing free product bailing activities. The well <br /> location map (Figure 2) is not accurate and does not correlate with the subsequent figures in the report. <br /> Monitoring well N-17 is not shown on any of the figures. Wells N-17 through N-19 were not sampled <br /> during the first quarter. MRP No. 94-806 requires that free product bailing activities be reported in the <br /> quarterly reports and that new wells be monitored and sampled on a quarterly basis. <br /> Your next quarterly report is due by 30 July 1995 and shall address all of the above issues. Regarding <br /> the installation of the ground water extraction system, your report states operation will begin in <br /> "mid-1995". By 7 July 1995, please submit a date for system startup. Also provide at least 72 Hours <br /> notice prior to any field activities in case I wish to split samples or observe field activities. <br /> If you have any questions, you may call me at(916) 255-3077. <br /> J L M. WEISS <br /> Engineering Geologist <br /> JMW.jmw/ldj <br /> cc: San Joaquin County Department of Public Health Services, Stockton <br /> Mr. Scott Seyfried, Levine-Fricke, Roseville <br />
The URL can be used to link to this page
Your browser does not support the video tag.