Laserfiche WebLink
OCT 12 194 8: 39 FROM LF ROSEOILLE PAGE .0O2 <br /> LEVIN&FRIC E', <br /> September 29, 1994 LF 3128.40 <br /> Mr. Joel Weiss <br /> lRegional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827 <br /> Subject: Status of Work at the Santa Fe Pacific Pipeline <br /> Partners, L.P. Halt Site <br /> Dear Mr. Weiss: <br /> This letter follows our telephone conversation on September <br /> 22, 1994 regarding the status of work at the subject site <br /> ("the Site") , and our proposed schedule for further work. The <br /> proposed schedule for further work presented Herein is in <br /> response to the empletion dates for specific tasks presented <br /> in' your letter to SFPP dated August 22, 1994. Current <br /> activities at the Site are being conducted in accordance with <br /> "Work Plan for Further Soil and Ground-Water Investigation and <br /> Implementation of interim Remedial Measures, " prepared by <br /> Levine+Fricke and dated March 15i- 1994- That Work Plan <br /> previously was approved by you in your April 1, 1994 letter to <br /> SFPP. <br /> As we discussed, the proposed soil-gas investigation was <br /> conducted at the Site on September 14, 1994 (results of soil- <br /> gas investigation are attached) . Also attached for your <br /> review and approval are the proposed locations, of the two <br /> additional ground-water monitoring wells proposed in the Work <br /> Plan. As we discussed on September 22, a third 4-inch <br /> diameter well a.iso has been proposed adjacent to existing well <br /> N-16 (constructed with 2-inch diameter casing) to assist with <br /> the completion of well efficiency tests_ <br /> 3(X}1 Dough Boulevard,Suite 3203 <br /> Rosevile,Cafilomio 95661 <br /> (916)786-0320 <br /> Fax(91 b)7{#{r O366 <br /> OhNwo#bes P Envey%,Ak,CA;krone_GA;TL1k14rr_-see.FL&k*'CfV1U n, <br />