My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:17:21 AM
Creation date
6/18/2019 10:32:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT 12 194 8: 39 FROM LF ROSEOILLE PAGE .0O2 <br /> LEVIN&FRIC E', <br /> September 29, 1994 LF 3128.40 <br /> Mr. Joel Weiss <br /> lRegional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827 <br /> Subject: Status of Work at the Santa Fe Pacific Pipeline <br /> Partners, L.P. Halt Site <br /> Dear Mr. Weiss: <br /> This letter follows our telephone conversation on September <br /> 22, 1994 regarding the status of work at the subject site <br /> ("the Site") , and our proposed schedule for further work. The <br /> proposed schedule for further work presented Herein is in <br /> response to the empletion dates for specific tasks presented <br /> in' your letter to SFPP dated August 22, 1994. Current <br /> activities at the Site are being conducted in accordance with <br /> "Work Plan for Further Soil and Ground-Water Investigation and <br /> Implementation of interim Remedial Measures, " prepared by <br /> Levine+Fricke and dated March 15i- 1994- That Work Plan <br /> previously was approved by you in your April 1, 1994 letter to <br /> SFPP. <br /> As we discussed, the proposed soil-gas investigation was <br /> conducted at the Site on September 14, 1994 (results of soil- <br /> gas investigation are attached) . Also attached for your <br /> review and approval are the proposed locations, of the two <br /> additional ground-water monitoring wells proposed in the Work <br /> Plan. As we discussed on September 22, a third 4-inch <br /> diameter well a.iso has been proposed adjacent to existing well <br /> N-16 (constructed with 2-inch diameter casing) to assist with <br /> the completion of well efficiency tests_ <br /> 3(X}1 Dough Boulevard,Suite 3203 <br /> Rosevile,Cafilomio 95661 <br /> (916)786-0320 <br /> Fax(91 b)7{#{r O366 <br /> OhNwo#bes P Envey%,Ak,CA;krone_GA;TL1k14rr_-see.FL&k*'CfV1U n, <br />
The URL can be used to link to this page
Your browser does not support the video tag.