Laserfiche WebLink
cT TF OF: rAI IF013NIA FnvirnnmPntal PrntPr A a r PFTF WII 4C1N C,nvecnnL_ <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD ua�' <br /> CENTRAL VALLEY REGION3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 C4 JAN f0 PH 2: 2a <br /> PHONE: (916) 255-3000 <br /> FAX: (916) 255-3015 <br /> 4 January 1994 <br /> Mr. Steve M. Ferrara <br /> Santa Fe Pacific Pipeline Partners, L.P. <br /> 888 South Figueroa Street <br /> Los Angeles, CA 90017 <br /> SANTA FE PACIFIC PIPELINE LEAK, HOLT, SAN JOAQUIN COUNTY <br /> Enclosed is a memorandum which summarizes the information we have on file regarding the <br /> petroleum leak at the subject site. In 1987, the lateral extent of both soil and ground water <br /> contamination was defined, but due to the long wait in implementing cleanup efforts, the <br /> contaminant plume has now spread beyond the most peripheral monitoring wells. Before full-scale <br /> remediation of the site can begin, the complete lateral and vertical extent of the soil and ground <br /> water contamination must be defined. <br /> Therefore, by 1 February 1994, please submit a comprehensive work plan to define the extent of <br /> contamination and implement interim remedial measures. The work plan shall include a schedule of <br /> all proposed activities. <br /> If you have any questions, please call Joel Weiss at (916) 255-3077. <br /> 1 <br /> WENDY L. COHEN <br /> Senior Engineer <br /> JMW:Idj <br /> cc: San Joaquin County Public Health Services, Stockton <br /> Mr. Mark Olson, Terra Services, Mission Viejo <br />