My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:14:59 AM
Creation date
6/18/2019 10:39:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steven Osborn • 3 • 14 November 2007 <br /> KMEP Holt Release Site, Holt <br /> • Upgradient wells M-2 and M-3 are removed from the program. KMEP should <br /> continue to sample M-1 because this well provides northeasterly plume definition <br /> and is the only well in this area. <br /> • Deep wells N-21 through N-23 are removed, but KMEP needs to continue <br /> monitoring N-24 due to the concentrations of benzene and TPHg. <br /> • MTBE and TBA are removed from the list of constituents. <br /> • General chemistry analyses associated with the bioremediation pilot study are <br /> removed, but field readings for dissolved oxygen and oxygen reduction potential are <br /> still required in order to provide data to monitor MNA progress. <br /> 3. The text of the Work Plan lists the 10 SVE wells as SVE-1 through SVE-10, but the <br /> figures and boring logs identify them as VEW-1 through VEW-10. KMEP should refer <br /> to the wells as VEW-1 through VEW-10 in future reports. <br /> 4. Regional Water Board staff concur with the destruction of the 10 SVE wells and deep <br /> wells N-21 through N-23. KMEP should destroy these wells as outlined in the Work <br /> Plan and notify Regional Water Board staff when the wells have been properly <br /> destroyed. <br /> In summary, by 5 December 2007, please review and provide comments on the attached draft <br /> MRP. KMEP should also proceed with the destruction of the 10 SVE wells and deep wells N- <br /> 21 through N-23 and notify Regional Water Board staff when completed. <br /> If you have any questions, you may contact me by phone at (916) 464-4819 or email me at <br /> kshelton(a�waterboards.ca.gov. <br /> sv� <br /> KRISTI SHELTON <br /> Water Resources Control Engineer <br /> Aboveground Tanks Cleanup Unit <br /> cc: Mr. Dennis Kalson, Solano County Department of Environmental Management, Fairfield <br /> Mr. Cleve Solomon, Delta Environmental Consultants, Monrovia <br />
The URL can be used to link to this page
Your browser does not support the video tag.