My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:14:59 AM
Creation date
6/18/2019 10:39:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct-08-01 04 : 11P • • P- 01 <br /> CH2M H I LL FAX San Francisco Office(SFO) <br /> 155 Grand Avenue, Suite 1000 <br /> Oakland, CA 94612 <br /> Office Tel(510)-251-2426 <br /> Office Fax(510)-893-8205 <br /> Date: October 8, 2001 <br /> From: David Thomas <br /> Direct Fax : (510) 622-9029 <br /> Direct Phone: (510) 251-2888 ext. 2029 <br /> Email: dthomas4@ch2m.com <br /> To: Jeffery Wong Company: San Joaquin County PHS <br /> Fax: (209) 468-3433 <br /> Voice: (209) 468-3420 <br /> Message: <br /> 0 <br /> Per your request, please find attached the following: <br /> • Addendum to the Work Plan for Source Area Characterization for the SFPP, L.P. <br /> Holt Release Site, Holt California (September 7,2001) <br /> • September 27,2001 Revisions to Work Plan <br /> An original workplan for the source area characterization was prepared by a previous <br /> consultant. The attached addendum provides all the details of the work, but does not <br /> reiterate the introduction and site background. Some revisions were made to the <br /> workplan following a telephone meeting with the RWQCB in late September. The <br /> attached email to the RWQCB summarizes the changes agreed upon following the <br /> phone meeting. <br />\ KMEP is the client, however CH2M HILL will be handling all billing and fees for permits, <br /> etc. Billings addressed to CH2M HILL (address above) should be addressed to Keith <br /> Sheets. <br /> Regards, <br /> David <br /> Total Pages: <br /> Please call if pages are missing or illegible or if you receive this fax in error. <br />
The URL can be used to link to this page
Your browser does not support the video tag.