Laserfiche WebLink
Oct-08-01 04: 12P . . P.05 <br /> 1 <br /> 1 .0 Introduction <br /> This addendum is for the Work Plan for Source Area Characterization for the SFPP,L.P.Holt <br /> Release Site,Holt,California,prepared by LFR Levine-Fricke[LFR],on behalf of SFPP, L.P., <br /> operating partnership for Kinder Morgan Energy Partners,L.P. (KMEP),on April 13,2001 <br /> (LFR,2001). The original Work Plan was prepared in response to a request from the <br /> Regional Water Quality Control Board,Central Valley Region(RWQCB)during a meeting <br /> on February 6,2001. On June 12,2001,the RWQCB submitted comments to KMEP related <br /> to the original Work Plan. KMEP and their consultant,CH2M HILL,met with the RWQCB <br /> on August 15,2001,to discuss the scope of the investigation described in the original Work <br /> Plan,and the RWQCB comments presented in the June 12,2001,letter. This addendum <br /> presents the revised scope of work,methods and procedures,and schedule to characterize <br /> the source area at the SFPP,L.P.Holt release site(the Site,Figure 1)as discussed during the <br /> August 15,2001,meeting with the RWQCB. This addendum addresses the June 12,2001, <br /> RWQCB comments on the original Work Plan prepared on April 13,2001. <br /> Combined with the April 13,2001,Work Plan,this Addendum presents information <br /> necessary to implement the revised source area characterization(SAC). This addendum is <br /> intended to be a supplement to the original Work Plan;only changes from the original scope <br /> of work are described in this addendum. The format of this addendum is similar to the <br /> original Work Plan,and includes the following sections: <br /> • Section 2 - Site history and background <br /> • Section 3 - Overview of the proposed characterization activities,field methods and <br /> procedures,and laboratory analysis <br /> • Section 4 - Summary of reporting approach and outline <br /> • Section 5 - Schedule <br /> The revised scope of work,methods,and procedures to implement the SAC are consistent <br /> with the discussions held with the RWQCB during the August 15,2001,meeting. The <br /> revisions are made to enhance the investigations presented in the April 13,2001,Work Plan, <br /> which originally included the collection of soil and groundwater data from 14 locations in a <br /> "Phase 1 Characterization"area. An additional area,referred to as the "Phase 2 <br /> Characterization"area,was identified within which additional data would be collected if <br /> the Phase I Characterization objectives were not met. For scoping purposes,the 14 original <br /> locations were spaced across the Phase I Area on a uniform grid;and the depth of <br /> investigation at each location was targeted to be 50 feet below ground surface(bgs). <br /> This addendum incorporates the following additional elements identified since the original <br /> scoping was performed for the April 13,2001,Work Plan: <br /> • <br /> The June 12,2001,RWQCB comments on the April 13,2001,Work Plan are addressed. <br /> S=LAW 3209.DOU 012430001 <br /> 1 <br />