My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:14:08 AM
Creation date
6/18/2019 10:47:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br /> Lucich, Roger/BAO <br /> From: Kristin Shelton[Kshelton@waterboards.ca.gov] <br /> Sent: Monday, June 02, 2008 12:42 PM <br /> To: Wuttig, Mark[THO; fgirardi@sjcehd.com <br /> Cc: Lucich, Roger/BAO; OsbornS@kindermorgan.com <br /> Subject: Re: ADDENDUM-- Holt Well Destruction <br /> Attachments: Kristin Shelton.vcf <br /> _;: <br /> Kristin Shelton.vcf <br /> (714 B) <br /> Mark - <br /> Regional Water Board staff concur with the attached work plan addendum. KMEP should <br /> proceed with the well destructions as outlined. <br /> Kristi Shelton <br /> Water Resources Control Engineer <br /> California Regional Water Quality Control Board - Central Valley <br /> Phone: 916-464-4819 <br /> Fax: (916) 464-4797 <br /> Email: kshelton@waterboards.ca.gov <br /> >>> <Mark.Wuttig@CH2M.com> 6/2/2008 9:57 AM >>> <br /> Kristi and Frank, <br /> Attached is an addendum to the work plan to destroy the 10 SVE and 3 <br /> deep monitoring wells at the Holt Release Site. The addendum changes <br /> the methodology to destroy the 3 deeper wells using pressure grouting <br /> instead of over drilling. The pressure grouting methods incorporate the <br /> San Joaquin County Well Standards (February 2005) , as discussed between <br /> Frank and Roger Lucich. <br /> Please let us know if you have any questions. We are still planning to <br /> commence the well destruction work this Wednesday (June 4) , so your <br /> prompt review and approval of this work plan is appreciated. <br /> Thanks <br /> Mark <br /> -----Original Message----- <br /> From: Kristin Shelton [mailto:Kshelton@waterboards.ca.gov) <br /> Sent: Thursday, May 29, 2008 8:54 AM <br /> To: Wuttig, Mark/THO <br /> Cc: Lucich, Roger/BAO; OsbornS@kindermorgan.com; fgirardi@sjcehd.com <br /> Subject: Re: Holt Well Destruction <br /> Hello Mark - <br /> As we discussed the morning, I concur with your proposal to pressure <br /> grout N-21, N-22, and N-23 in place. KMEP should remove the top five <br /> feet of casing as required by SJCEHD and obtain the appropriate well <br /> destruction permits. <br /> Kristi Shelton <br /> Water Resources Control Engineer <br /> California Regional Water Quality Control Board - Central Valley <br /> Phone: 916-464-4819 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.