My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS 2009 YEAR 3 PHYTOEMEDIATION TREE MONITORING REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
ARCHIVED REPORTS 2009 YEAR 3 PHYTOEMEDIATION TREE MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:17:49 AM
Creation date
6/18/2019 10:56:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009 YEAR 3 PHYTOEMEDIATION TREE MONITORING REPORT
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 1 <br /> Introduction <br /> ' This tree monitoring report was prepared by CH2M HILL on behalf of SFPP, L.P.,an <br /> operating partnership of Kinder Morgan Energy Partners, L.P. (SFPP) for submittal to the <br /> ' Central Valley Regional Water Quality Control Board (RWQCB). This report documents the <br /> results of the third year (Year 3) of tree monitoring performed following installation of the <br /> phytoremediation system at the SFPP Holt Release Site (Site). <br /> ' The phytoremediation system was installed in two phases,January/February 2005 and <br /> April/May 2006,in accordance with the following cleanup plan that was conditionally <br /> approved in an October 5,2004 letter by the RWQCB: Cleanup Plan Using Phytoremediation for <br /> the Source Area at the SFPP, L.P. Holt Release Site, Holt, California (CH2M HILL,2004) <br /> (Phytoremediation Cleanup Plan). <br /> 1 As-built conditions of the two phytoremediation system installation phases are documented <br /> in the following two reports that were submitted to the RWQCB: (1) Phytoremediation <br /> As-Built Report for the Source Area at the SFPP, L.P. Holt Release Site, Holt, California <br /> (CH2M HILL, 2005) and (2) Phytoremediation As-Built Report, Construction Season 2,for the <br /> Source Area at the SFPP, L.P. Holt Release Site,Holt, California (CH2M HILL,2007). Tree <br /> ' Monitoring results for Years 1 and 2 were reported in the Year 1 and Year 2 Phytoremediation <br /> Tree Monitoring Reports for the Source Area at the SFPP, L.P. Holt Release Site, Holt, California <br /> (CH2M HILL 2008a,2008b). <br /> ' This tree monitoring report provides the following: <br /> • Section 2-Overview of the phytoremediation system <br /> ' • Section 3-Tree system monitoring methodology <br /> • Section 4 -Year 3 tree system monitoring results <br /> • Section 5-Summary and recommendations from the Year 3 monitoring results <br /> ' The location of the Site is shown in Figure 1-1.The Site and vicinity are shown in the aerial <br /> photograph in Figure 1-2. The tree phytoremediation planting layout that was originally <br /> ' proposed is shown in Figure 1-3.The actual planting layout representing the as-built <br /> condition is depicted in Figure 14. Irrigation details are presented in Figure 1-5. <br /> ' SAC1166749/PANAGON(YEAR3_2009_HOLTTREE_MONITORING REPORT.DOC) 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.