My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS 2011 YEAR 5 PHYTOREMEDIATION TREE MONITORING REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
ARCHIVED REPORTS 2011 YEAR 5 PHYTOREMEDIATION TREE MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:18:28 AM
Creation date
6/18/2019 10:57:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011 YEAR 5 PHYTOREMEDIATION TREE MONITORING REPORT
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2 <br /> Tree System Overview <br /> This section provides an overview of the phytoremediation system. Trees were planted in <br /> ' six sub areas: Areas A, Addition to Area A, AA, B,C and D.The phytoremediation system <br /> was installed in two phases: the first occurring in January/February 2005, and the second in <br /> April/May 2006. Work was performed in accordance with the Phytoremediation Cleanup <br /> Plan (CH2M HILL,2004).Tree and irrigation system installation were documented in <br /> two as-built reports that were submitted to the RWQCB (CH2M HILL 2005;CH2M HILL <br /> 2007). Tree Monitoring results for Years 1, 2,3,and 4 were reported in the Year 1, Year 2, <br /> Year 3, and Year 4 Phytoremediation Tree Monitoring Reports for the Source Area at tyre SFPP, L.P. <br /> Holt Release Site, Holt, California (CH2M HILL 2008a,2008b,2010a, and 2010b). <br /> 2.1 Size and Location of Phytoremediation Areas <br /> The phytoremediation area, as constructed,is shown in Figure 1-4. The phytoremediation <br /> area is subdivided into six sub areas:Areas A,Addition to Area A,AA, B,C,and D.The <br /> criteria used to develop these areas included maximizing plant coverage within the affected <br /> area to the northwest of Whiskey Slough Road while maintaining vehicle access to the roads <br /> along the current and former SFPP pipeline alignments. <br /> Table 2-1 lists the approximate size of each phytoremediation area. <br /> TABLE 2.1 <br /> Approximate Sizes of Phytoremediation Areas <br /> Planting Area Approximate Size(acres) Included in Cleanup Plan <br /> Area A 0.13 Yes <br /> Addition to Area A 0.19 No—Area added during implementation <br /> Area AA 0.01 Yes <br /> Area B 0.08 Yes <br /> Area C 0.07 Yes <br /> Area D 0.28 Yes <br /> Approximate Total Acreage 0.76 <br /> NOTE: <br /> Cleanup Plan refers to the following reference—Cleanup Plan Using Phytoremediation for the Source Area at <br /> the SFPP, L.P. Holt Release Site, Holt, California (CH2M HILL,2004). <br /> 2.2 Tree and Irrigation System Installation <br /> During Construction Season 1 (January/February 2005),a total of 173 trees were planted <br /> within Areas A,AA, B, and the Addition to Area A. An additional 65 trees were installed in <br /> � ' SAC44203071113570001(YEAR5.2011_HOLTTREE MONITORING_REPORT-FINALDOCX) 2.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.