Laserfiche WebLink
1.INTRODUCTION <br /> Construction of Phases 1 and 2 is documented in two respective as-built reports , <br /> (CH2M HILL,2005 and 20O7b). <br /> 1.2.4 Monitoring and Reporting Program , <br /> The previous MRP No. R5-2004-0803 was issued on January 30,2004,by the RWQCB. In <br /> addition to monitoring general groundwater conditions, the previous MRP was developed <br /> specifically to monitor the bioremediation pilot test, as described in the Bioremediation Pilot <br /> Study Work Plan(CH2M HILL, 2003). The MRP required detailed quarterly groundwater <br /> monitoring,semiannual reports for the first semiannual period (fourth quarter 2006 and first <br /> quarter 2007) and for the second semiannual period (second and third quarters 2007),in <br /> addition to semiannual electronic data reports submitted for the second and fourth quarters. , <br /> The current MRP,No. R5-2007-0831,was issued on November 29,2007,by the RWQCB. <br /> This MRP was developed to monitor current Site conditions with MNA and <br /> phytoremediation as remedies. This MRP eliminated most of the parameters added in the <br /> previous MRP to monitor the bioremediation pilot test, eliminated unnecessary monitoring <br /> wells and parameters, allowed for the destruction of unnecessary monitoring wells, and <br /> allowed for the destruction of the soil vapor extraction well system. <br /> r <br /> r <br /> r <br /> r <br /> r � <br /> r <br /> r <br /> i <br /> 14 WBG101513183707SCO MOLT2SA13_REPORT_FINAL <br />