Laserfiche WebLink
4. References <br /> CH2M HILL. 2002. Final Site Characterization Report for the SFPP, L.P. Holt Release Site, Holt, <br /> California.January 31. <br /> CH2M HILL. 2003. Bioremediation Pilot Study in Lieu of Continued Groundwater Pump and Treat <br /> for the SFPP, L.P. Holt Release Site, Holt, California.July 3. <br /> ' CH2M HILL. 2004. Cleanup Plan Using Phytoremediation for the Source Area. September 10. <br /> CH2M HILL. 2005. Phytoremediation As-Built Report for the Source Area at the SFPP, L.P. Holt <br /> Release Site, Holt, California. May 31. <br /> ' CH2M HILL. 2007a. 3-Year Evaluation of the Bioremediation Pilot Study for the SFPP, L.P. Holt <br /> Release Site, Holt, California.June 13. <br /> ' CH2M HILL. 2007b. Phytoremediation As-Built Report, Construction Season 2,for the Source <br /> Area at the SFPP, L.P. Holt Release Site, Holt, California.January. <br /> ' CH2M HILL. 2011. Second Semiannual and 2011 Annual Groundwater Monitoring Report for the <br /> SFPP, L.P. Holt Release Site, Holt, California. October 31. <br /> CH2M HILL. 2013. First Semiannual 2013 Groundwater Monitoring Report for the SFPP, L.P. <br /> Holt Release Site, Holt, California. April 30. <br /> ' NBG101513183707SCO M0LT_2SA13_REP0RT_FINAL 41 <br />