Laserfiche WebLink
Former Countryside Market,Stockton,California <br /> Feasibility Study and Interim Remedial Action Plan May 20,2013 <br /> Section 5.0- Proposed Feasibility Testing and Data Collection Plan <br /> This section presents the testing details for confirming the viability of the selected groundwater remedial <br /> technology, including data collection activities that will also serve to determiihe if one or more of the other <br /> final alternative technologies requires closer consideration for potential incorporation into the proposed <br /> interim and/or final cleanup strategy. This section also includes details for collecting soil physical <br /> property and background geochemical/bioremediation indicator data, as well as potential vapor extraction <br /> testing activities in the event the soil/soil gas data warrants this additional phase of work. <br /> Section 6.0: Vertical Plume Delineation Assessment <br /> This section presents the plan for assessing the migration of plume constituents that have been detected <br /> in downgradient domestic wells, including video logging and cone penetration testing (CPT) activities, <br /> which will be conducted first so that the results�ndings can be utilized to modify the proposed feasibility <br /> testing/data collection plans (Section 5.0), if necessary. <br /> Section 7.0: Interim Remedial Action Plan <br /> This section provides details of the recommended interim remedial action for the Site, and the strategy <br /> that will be employed to make adjustments to the plan based on the vertical plume delineation <br /> assessment(Section 6.0), and feasibility testing data/results (Section 5.0). Niso included in this section is <br /> a proposed long-term groundwater monitoring and sampling program. <br /> Section 8.0: Soil and Groundwater Cleanup Criteria <br /> This section specifies the soil and groundwater cleanup criteria for the Ste and surrounding area, and <br /> presents the basis for potentially establishing interim cleanup levels within the plume as part of a final <br /> RAP. Soil data proposed for collection during the feasibility testing phase (Section 5.0) will be compared <br /> against the appropriate criteria to determine if vadose zone remedial acti fities are required to cleanup <br /> residual impacts in the former UST area. <br /> Section 9.0: Reporting <br /> This section provides details associated with planned interim and ongoing progress reporting for the Site, <br /> including the future utilization of soil data (proposed to be collected during feasibility testing and IRAP <br /> implementation activities) to estimate the mass of petroleum hydrocarbons at the Site and surrounding <br /> area. <br /> Section 10.0: Estimated Proiect Schedule <br /> This section provides an estimated project schedule from proposed fgasibility testing through Site <br /> closure/post-remediation monitoring. <br /> Section 11.0: References <br /> This section provides citations to the documents referenced in this report. <br /> Feasibility SWdy&IRAP—TW Fnel.dw 1-2 The Source Group,Inc. <br />