My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
3500 - Local Oversight Program
>
PR0544574
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 12:14:10 PM
Creation date
6/18/2019 11:27:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544574
PE
3528
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD OPERATING PROCEDURE: <br /> SOIL SAMPLING FROM BORINGS <br /> HOLLOW-STEM AUGER METHOD <br /> Soil samples for chemical analysis are collected in thin-walled brass tubes, 6-inches (in) long by <br /> 2-in or 2.5-in outside diameter (OD). Three of these tubes are set inside a 2-in or 2.5-in inside <br /> diameter (ID) 18-in long split-barrel sampler. <br /> The split-barrel sampler is lowered to the bottom of the hollow stem auger string and driven its <br /> entire length either hydraulically or using a 140-pound drop hammer. Thus, the sampler <br /> retrieves relatively undisturbed soils below the advancing auger. The sampler is extracted from <br /> the borehole and the brass tubes containing the soil samples are removed. Upon removal from <br /> the sampler, the selected brass tubes are immediately trimmed and capped with aluminum foil <br /> or teflon liners and plastic caps. They are then labeled and refrigerated to 4° C for delivery, <br /> under chain-of-custody, to the analytic laboratory. These procedures minimize the potential for <br /> cross-contamination and volatilization of volatile organic compounds (VOCs) prior to chemical <br /> analysis. <br /> One soil sample collected at each sampling interval is analyzed in the field using a <br /> photoionization detector (PID). The purpose of this field analysis is to qualitatively determine <br /> the presence or absence of hydrocarbons and to establish which soil samples will be analyzed <br /> at the laboratory. The soil sample is sealed in a zip-lock plastic bag and placed in the sun to <br /> enhance volatilization of the hydrocarbons from the sample. The sample is then measured by <br /> the PID and the data recorded at the depth corresponding to the sample point in the field notes. <br /> Other soil samples are collected to document the stratigraphy and estimate relative permeability <br /> of the subsurface materials. Up to 4.5 feet of continuous sample interval may be recovered <br /> without advancing the auger by driving 2.5-in ID, 2-in ID, and 1.5-in ID 18-in long split-barrel <br /> samplers in succession ahead of the lead auger. This procedure is known as "telescoping". <br /> Density or consistency of soils are measured by blow counts, Torvane or pocket penetrometer. <br /> All drilling and sampling equipment is steam-cleaned prior to use at each site and between <br /> boreholes to minimize the potential for cross-contamination. Brass tubes and split-barrel <br /> samplers are steam-cleaned or washed with Liquinox'detergent and double-rinsed between each <br /> use. <br /> r <br /> r <br /> r <br /> .r <br />
The URL can be used to link to this page
Your browser does not support the video tag.