My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
4025
>
3500 - Local Oversight Program
>
PR0544575
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 12:19:10 PM
Creation date
6/18/2019 11:35:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0544575
PE
3528
FACILITY_ID
FA0003806
FACILITY_NAME
J.H. SIMPSON CO., INC
STREET_NUMBER
4025
STREET_NAME
CORONADO
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11530025
CURRENT_STATUS
02
SITE_LOCATION
4025 CORONADO AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 4025 Coronado Avenue, Stockton, CA 95204 <br /> Owner J.H. Simpson Company Phone No. (209)46b-1477 <br /> Contractor JIM THORPE OIL, INC. Phone No. (209)368-6175 License N0.495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> X 2. Submission of verification,e.g., load ticket,within 30 days of project completion that one of the following materials <br /> was placed in the excavation to 12 lifts: <br /> X A. Pea gravel—smooth, rounded material not more than one-half(M) inch In diameter . <br /> _ B. Crushed rock—self-compacting material not more than three-quarters (314) inch in cross sectional <br /> the <br /> mmsureinent. <br /> and tanks/pipes made of pUse of crushed rock will not be oly resin glass or sitted for imilar rr mateif rials will be <br /> made between <br /> DECLARATION <br /> I herchy certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofroject completion,or submission <br /> of verification that the select material described above will be placed at a minimum of five(S�cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br /> Code Appendix Chapter 70. <br /> • JIM THORPE OIL,INC. <br /> Name (Print) <br /> • CONT (jr 7 <br /> u <br /> sigftwe <br /> • Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.