My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
4025
>
3500 - Local Oversight Program
>
PR0544575
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 12:25:00 PM
Creation date
6/18/2019 11:41:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544575
PE
3528
FACILITY_ID
FA0003806
FACILITY_NAME
J.H. SIMPSON CO., INC
STREET_NUMBER
4025
STREET_NAME
CORONADO
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11530025
CURRENT_STATUS
02
SITE_LOCATION
4025 CORONADO AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Location 4025 Coronado Avenue, Stockton, CA 95204 <br /> Project � <br /> Owner J.H. Simpson Company Phone No. (209)466-1477 <br /> Contractor JIM THORPE OIL, INC. Phone No. (209)368-6175 License N0.495699 <br /> I <br /> INDICATE METtIOD OF BACKFILL QUALITY ASSURANCE <br /> i <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> X 2. Submission of verification, e.g., load ticket,within 30 days of project completion that one of the following materials <br /> was placed in the excavation In 12" lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter . <br /> B. Crushed rock--seir-compectinit material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill If contact will be made between <br /> tate backfill material and tanks/pips made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I herchyy certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion,or submission <br /> ank <br /> displacementof rthat the and that tate entire excavalect material tion will bcribed e�b backfilled ve will be and compaclaced at a tedmum or o insure Rcomliance with thards e Uniform <br /> Building <br /> Appendix Chapter 70. <br /> �+ it <br /> • JIM 111ORPE OIL,INC. <br /> Name (Print) <br /> • CONT <br /> t <br /> -17 <br /> Sigitmote <br /> • Shall be the responsible managing employee on lite license or authorized agent. <br /> i <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.