11 : 1 t-40. OE-4 F-Q0D 00
<br /> Federal Register f Vol. be, No. 8 J Wednesday, January 9, 1991 / Notices 849
<br /> attorneys In this matter,at Newman environmental documentation for the 100-year floodplain of the Corral Hollow
<br /> Holtzinger,P,C.,10115 L Street, NW., proposed action. Intervening and Creek. Specifically,the proposed action
<br /> Washington,DC 20038 and E. Gregory becoming a party to this proceeding will wi
<br /> Barll involve the construction of an
<br /> nes, Principal Attorney.Sar,Diego create any special status for the extraction well and a treatment facility
<br /> Can a Electric Company,P.O, Box 1831. petitioner with regard to the NEPA
<br /> San Diego,California 82312, process. Should a public proceeding be outside the tthlain,and the laying of
<br /> protests
<br /> Pursuant to 18 CFVR 385.211, necessary in order to comply with piping beneath the surface of the
<br /> floodplain.Operation of the facility
<br /> and comments will be considered by the NEPA,notice of such activities and
<br /> DOE in determining the appropriate Information on how the public can involves the extraction of halogenated
<br /> action to be taken, but will not serve to participate in those activities will be hydrocarbon contaminated water from
<br /> make protectants parties to the published in the Federal Register,local the Corral Hollow alluvial aquifer.
<br /> proceeding. Any person wishing to newspapers and public libraries and/or treatment of that water to remove
<br /> become a party must file a petition to reading rooms in the vicinity of the halogenated hydrocarbons, and the
<br /> intervene under 18 CFR 385.214. Section electric transmission facilities. discharge of a maximum of 100 gallons
<br /> 385.214 requires that a petition to per minute of treated groundwater to
<br /> Intervene must state,to the extent Copies of this application will be Corral Hollow Creek,an ephemeral
<br /> known, the position taken by the made available, upon request,for public stream.The discharged water is
<br /> petitioner and the petitioner's interest In Inspection and copying at the expected to recharge the Corral Hollow
<br /> sufficient factual detail to demonstrate Department of Energy's Freedom of alluvial aquifer within loo to 200 feet of
<br /> either that the petitioner has a tight to Information Room,Room 1E-190, the discharge point. The underground
<br /> participate because it is a State Forrestal Building, 1000 Independence piping will be installed in such a manner
<br /> Commission: that it has or represents an Avenue, SW, Washington.DC.from 8 as to minimize any effect on the
<br /> interest which may be directly affected a.m. to 4 p.m..Monday through Friday, f oodplain.In accordance with
<br /> by the outcome of the proceeding, except Federal holidays. Qoodplain/wetland environmental
<br /> Including any interest as a consumer, review requirements (10 CFR 1022),DOF
<br /> customer, competitor, or security holder Isoued in Washington.DC,on January 2, will prepare a floodplain/wetland
<br /> of a party to the proceeding:or that the 1991. assessment to be incorporated into the
<br /> petitioner's participation is in the public environmental assessment of the
<br /> interest. Anthony 1•coma, proposed action.Maps and further
<br /> A final decision will be made on this Dimctor,Office of Coal&Electriclry oftice o/ information are available from DOr?at
<br /> application after considering all Fuels Programs,Roaarl Energy. the address below,
<br /> available t and after a
<br /> determinationion Is to made by the DQE that [FR 00c.9184 Ftied 1-841:e:45 am] DAY20.Any comments are due up to and
<br /> the proposed transaction will not Impair WW"000t 44160-o" including January U.Im.
<br /> the sufficiency of electric supply within _ ADDRESSES:Send commonts to:
<br /> the United States or impede or tend to Sally A.Mann,Ph.D..Acting Director.
<br /> impede the coordination in the public Fioociplain and Wetland Involvsm*nt Northwestern Area Programs, Offlce
<br /> Interest of facilities subject to the Notifleation for R*m*dial Action at th* of Environmental Restoration and
<br /> Jurisdiction of the DoE. Eastern 04nerai S*rvlcss Area,Site Waste Management,U.S.Department
<br /> Before a Presidential permit may be 300,Lawr*nce Ltv*rmore National
<br /> issued, the environmental impacts of the Laboratory of Energy, Washington,DC Y058s 1301)
<br /> proposed DOE action{i.e.,granting the 353-3253.
<br /> Presidential permit, with any conditions issued at Washington.DC.this 3rd day of
<br /> and llmitations,or denying the permit) AOSNCr.Department of Energy. January.1991.
<br /> must be evaluated pursuant to the ACTION:Notice of floodplain and
<br /> National Environmental Policy Act of wetland involvement. pad L Zieaaer,
<br /> 1889(NEPA).The NEPA compliance Assistant SewotaryfcrEnvironmeni,Safety
<br /> process is a cooperative,non- �y.The De and Health.
<br /> SUMMARY*process involving members Department of Energy ( peC 91-460 Piled 1-6-01;6:46 ami
<br /> of the public,state governments and the (DOE)Proposes io conduct remedial �o 000s 041110-61-40Federal government.The process actions involving pumping and treating
<br /> affords all persona Interested in or contaminated groundwater at Lawrence
<br /> potentially affected by the Livermore National Laboratory, Site 300, Financial Assistance;Univ*ratty
<br /> environmental consequences of a San Joaquin County, California. R*actor Sharing Program;Unlversiity
<br /> proposed action an opportunity to Remedial action would include Of Ftodda,*t al
<br /> present their views,which will be Installation of underground piping and
<br /> considered in the preparation of the the discharge of treated water into the AGRNGY:Department of Energy,
<br />
|