Laserfiche WebLink
Lawrence Livermore National Laboratory Site 300 <br /> Ll <br /> Tracy, California Fa <br /> March 1996 <br /> UCRL�Af=122 85 <br /> The United States Department of Energy <br /> .Presents the Proposed Plan for Remediation of <br /> &Ah- ' j,awrence Livermore National Laboratory <br /> Site 300 General Services Area <br /> SAN JOA,�'ON r(Introduction Public Meeting <br /> PUBLICI EALTM LABLR;? U <br /> The United States Department of Energy DOE/LLNL encourage the public to attend <br /> (DOE) and Lawrence Livermore National a meeting at 6:00 pm on Apri124, 1996 in the <br /> Laboratory (LLNL) request public comments Crystal Room at the Tracy Inn,West 11th Street, <br /> on the Proposed Plan for remediating soil and Tracy,CA. Representatives from DOE/LLNL, <br /> ground water in the General Services Area U.S. EPA, and the State of California will dis- <br /> (GSA)at the LLNL Site 300 Experimental Test cuss the proposed remediation plan, hear your <br /> Facility. Site 300 is located in the Altamont concerns,and answer your questions during the <br /> Hills, in San Joaquin and Alameda counties, meeting. <br /> approximately 17 miles east of Livermore and A 30-day public review and comment pe- <br /> 8.5 miles southwest of Tracy (Figs. 1 and 2). riod on this document begins on April 10, 1996, <br /> This Proposed Plan summarizes site con- and ends May 10, 1996. All interested mem- <br /> ditions and remedial alternatives analyzed for bers of the public are encouraged to review and <br /> the site, and presents the rationale for selecting comment on the preferred remedy, and on all <br /> the preferred remedial alternative. This docu- remedial alternatives considered, if desired. <br /> ment solicits your input, which will be consid- You can submit your comments verbally at the <br /> ered in decisions made about the final public meeting or in writing. Written comments <br /> remediation plan. should be sent to Donna Sutherland, Site 300 <br /> The Proposed Plan was prepared to com- Remedial Project Manager, DOE (see page 16 <br /> ply with the Comprehensive Environmental for address) by May 10, 1996. <br /> Response, Compensation, and Liability Act <br /> (CERCLA) of 1980, as amended by the <br /> Superfund Amendment and Reauthorization Act <br /> (SARA) of 1986, and is required by the LLNL <br /> Site 300 Federal Facility Agreement signed by Table of Contents <br /> DOE, the U.S. Environmental Protection Introduction ............................................................1 <br /> Agency(U.S.EPA),the California Department Public Meeting........................................................1 <br /> of Toxic Substances Control (DISC), and the Role of the Regulatory Agencies............................4 <br /> Site Background .....................................................4 <br /> Central Valley Regional Water Quality Control Summary of Site Risks...........................................7 <br /> Board (RWQCB) in 1992. Summary of Cleanup Alternatives..........................9 <br /> The CERCLA process is summarized in Preferred Remedial Alternative............................ 14 <br /> Figure 3. For the GSA,DOE/LLNL have com- Comment Period...................................................16 <br /> pleted a detailed environmental investigation For More Information...........................................16 <br /> Information Repositories......................................17 <br /> (referred to as a Remedial Investigation),and a References ............................................................17 <br /> thorough screening and evaluation of possible Glossary................................................................17 <br /> Note: Italicized words are defined in the Glossary. <br /> 1 <br />