My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
0
>
2900 - Site Mitigation Program
>
PR0009019
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:01:27 PM
Creation date
6/18/2019 1:30:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009019
PE
2954
FACILITY_ID
FA0004085
FACILITY_NAME
LLNL-SITE 300
STREET_NUMBER
0
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT BY:LLNL ; 9-29-95 ; 8:07AM ; 51042224704 812084640138;# 3 <br /> f&Susan Timm <br /> California Regional Water Quality Control r3oard <br /> CQntral Valley-Region 5 <br /> Striiect: UrNfIcIal Meuse sof Diesel Fuel Contaminated Soil After Sioreomediutlon <br /> I <br /> goal (25 mg/L), this project is Included in the 500 cubic yards of soil because we have <br /> reason to believe that this soil pita was poorly characterized and contains actual <br /> contamination above 15 mrd. <br /> The bioremediation will be performed in the large flat <br /> graded area south of Building 865. <br /> Soil, bacteria, and nutrient components will be mixed using s mechanical mixer and <br /> discharged into piles where the bacteria will consume the diesel fuel. Treatment will be <br /> complete when the final concentration of diesel fuel is less than 25 mg/kg TRH-D. The <br /> expected time to completion is less than thirty days. <br /> �13�.�.seus�Proje+c <br /> After the completion of the soil bioremediation, the 500 cubic yards of sail will be used to <br /> extend the Corporation Yard across from Building 801. The proposed site is spawn in <br /> Attachment 2. Attachment 3 is a detailed drawing of the project site. The soil will be <br /> moved to the Building 801 Corporation Yard where It will be compacted and graded <br /> consistent with the contours of the existing 30 foot slope. The slope will be stabilized to <br /> minimize any runoff from the project site. The current Corporation Yard consists of <br /> packed and graded soil. No gravel or asphalt surface has been applied. The <br /> Corporation Yard is only used for long term storage of equipment such as steel and <br /> concrete blacks and short term storage of some mobile equipment. No liquids or wastes <br /> are stored at this siva. <br /> This project has been 4Diane Hinson of Ban uln County Public Health <br /> Services, who oversees tank removal projects at Site 300IThe project starts upon your <br /> approval. Please let us know if we may proceed with the proposed project. If you have <br /> any questions regarding the project, please call Karen Folks at (5t 0) 42.2-2367. <br /> Sincerely, <br /> i <br /> C. Susi Jackson, Leader <br /> Qpemtlons and Regulatory Affairs Division <br /> Attachments <br /> I <br /> cc: Edward Ballard, DOEIt_S+D, L-574 <br /> Mike grown, DOE/LSO, L--574 <br /> Steve Black, DOE/OAK <br /> Pamela Barksdale, CVRWQCB <br /> L► <br /> WGMG95A37-C8J;KF.gefn <br />
The URL can be used to link to this page
Your browser does not support the video tag.