Laserfiche WebLink
Mr. Robert Evans <br /> February 19, 1991 <br /> Page Two <br /> EPA Protocol 8015, 8020 and 418.1, as mentioned in our earlier work plan. Apart <br /> from installing the 3 new vadose zone wells within the treatment area, the existing well <br /> will be used as a vadose zone well. <br /> Attached is a work plan for installation of vadose zone monitoring wells. If you have <br /> any questions, please contact either of the undersigned at (415) 829-0661. <br /> Sincerely, <br /> L4 <br /> Prabhu N. Ravandur Oice <br /> P. Cummings, Ph.D., R.E A. R.E.P. <br /> Associate Staff Engineer president <br /> SCS Engineers SCS Engineers <br /> N1sR. /oh <br /> son, P.E. <br /> Sr. Project Engineer <br /> SCS Engineers <br /> PNR/JPC/NRJ/egh <br /> Attachment <br /> cc: Mr. Paul Verma, City of Tracy <br /> Department of Public Works <br /> Ms. Eleanor Ratliff, San Joaquin County <br /> Public Health Services, Stockton <br />