Laserfiche WebLink
KLE/NFELOER <br /> w.yh,RWM �1So,mlm <br /> 3.1 ANTICIPATED SCHEDULE <br /> Time Frame(weeks) Description of_Task. <br /> 2' Pre-field and Permitting <br /> 22 Background soil sampling, stockpile sampling and laboratory analyses <br /> 32 Soil boring, grab groundwater sampling, and laboratory analyses <br /> 2-3 Reporting <br /> Kleinfelder has no control over the time required to have the drilling permit approved. San Joaquin County EHD can <br /> z <br /> require up to 2 weeks to approve a permit. <br /> Laboratory analyses of soil and water samples will be performed using a standard 2 week processing timeframe. <br /> At this time the City anticipates contracting by March 14, 2013 and completion of the <br /> scope of work detailed in this work plan by May 30, 2014. Please note, the schedule <br /> does not include a confirmed start date due to the available funding and contracting <br /> processes of the City. Once the work plan is approved, the City will move forward to <br /> contract the execution of the work scope as quickly as reasonably possible. <br /> 128328/SAC14R0267 Page 10 of 11 July 12, 2013 <br /> Copyright 2013 Kleinfelder Revision 2-February 14,2014 <br />