My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
0
>
2900 - Site Mitigation Program
>
PR0538882
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2019 9:49:47 AM
Creation date
6/18/2019 2:00:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538882
PE
2960
FACILITY_ID
FA0022339
FACILITY_NAME
CITY OF TRACY CLASS II LAND TREATMENT UNIT
STREET_NUMBER
0
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
2531122
CURRENT_STATUS
01
SITE_LOCATION
CORRAL HOLLOW RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLE/NFELOER <br /> w.yh,RWM �1So,mlm <br /> 3.1 ANTICIPATED SCHEDULE <br /> Time Frame(weeks) Description of_Task. <br /> 2' Pre-field and Permitting <br /> 22 Background soil sampling, stockpile sampling and laboratory analyses <br /> 32 Soil boring, grab groundwater sampling, and laboratory analyses <br /> 2-3 Reporting <br /> Kleinfelder has no control over the time required to have the drilling permit approved. San Joaquin County EHD can <br /> z <br /> require up to 2 weeks to approve a permit. <br /> Laboratory analyses of soil and water samples will be performed using a standard 2 week processing timeframe. <br /> At this time the City anticipates contracting by March 14, 2013 and completion of the <br /> scope of work detailed in this work plan by May 30, 2014. Please note, the schedule <br /> does not include a confirmed start date due to the available funding and contracting <br /> processes of the City. Once the work plan is approved, the City will move forward to <br /> contract the execution of the work scope as quickly as reasonably possible. <br /> 128328/SAC14R0267 Page 10 of 11 July 12, 2013 <br /> Copyright 2013 Kleinfelder Revision 2-February 14,2014 <br />