Laserfiche WebLink
APPENDIX D <br /> FIGURES & PHOTOGRAPHS OF THE TANK CLOSURE ACTIVITIES <br /> FIGURE 1: Sample locations for the closure of UST 834-D1Ui. <br /> PHOTOGRAPH 1: Underground 834-DlU1 piping cleaned,capped,and ready for <br /> shipment. Extra dry ice. <br /> PHOTOGRAPH 2: The bottom of the 834-DlU1 excavation facing southwest showing <br /> the backhoe cuts at both ends. Soil samples were collected at the bottom <br /> of each cut. <br /> PHOTOGRAPH 3: Looking west,the pile of excavated materials and the 834-DlU1 tank <br /> showing the county identification number 39-1945-12. <br /> PHOTOGRAPH 4: Marion Heaton collecting a soil sample from the backhoe bucket,834- <br /> D1U1 tank closure excavation. <br /> PHOTOGRAPH 5: From left to right,834-DlU1 closure site: The pile of <br /> excavatedmaterials,the excavated tank,the clean soil to be used as fill, <br /> the lift,groundwater monitoring well W-834-D8,and the excavation. <br /> PHOTOGRAPH 6: Patti Muck collecting a soil sample from the pile of materials <br /> excavated at the 834-D1U1 closure site. <br /> D-1 <br />