My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
1785
>
2900 - Site Mitigation Program
>
PR0517366
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 5:09:39 PM
Creation date
6/18/2019 4:38:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517366
PE
2950
FACILITY_ID
FA0013377
FACILITY_NAME
FITZPATRICK HOMES
STREET_NUMBER
1785
Direction
N
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
949412933
CURRENT_STATUS
01
SITE_LOCATION
1785 N CORRAL HOLLOW RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> • The PVC pipe and end caps are steam cleaned prior to installation. <br /> • The annular space between the screen and the wall of the boring is backfilled with <br /> the appropriate clean sand to approximately 2 feet above the top of the perforated <br /> sections. Based on soil logs or a sieve test, modifications may be made regarding <br /> the size of sand to be used. Installation of the sand may require that the sand be <br /> tremmied, using clean water. <br /> • A 3- to 5-foot bentonite plug is placed above the sand pack to provide a seal <br /> against surface water infiltration and to reduce the potential for cement grout to <br /> infiltrate into the water. <br /> • The remaining annular space is filled to the surface with cement/bentonite grout. <br /> • The wells are secured in an aboveground or underground locking stovepipe. The <br /> well heads may be enclosed in a water tight cement utility box set flush to the <br /> ground surface when located in a traffic area. <br /> B-3.2 Monitoring Well Development <br /> The wells are developed to reduce the effects of drilling on the formation and to increase the <br /> effective hydraulic radius of the wells. <br /> Monitoring wells are generally developed 24 to 48 hours after installation to allow the grout to <br /> set. Each well is first sampled with a clear disposable bailer to visually inspect for a hydrocarbon <br /> layer or sheen. If no product layer or sheen is observed on the water, the well is developed by <br /> surging, pumping or bailing. Surging along the screened interval of the well is performed to <br /> draw the sediment from the formation into the filter pack and the well, and to set the sand pack. <br /> Development continues until the discharge runs relatively clear of fines. Approximately 5 to 10 <br /> well volumes are generally removed from each monitoring well. Discharge water is stored in 55- <br /> gallon drums and left on site for later discharge or disposal by the client, depending on laboratory <br /> results. The drums are labeled with the date, well number, and a contact person and phone <br /> number. <br /> B-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is washed <br /> in a trisodium phosphate or non-phosphate detergent solution and rinsed in distilled water or <br /> steam cleaned prior to use in the next monitoring well. <br /> 20-YPI-628/2011P180 Page B-5 <br /> 0 2001,Kleinfelder,Inc. July 2,2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.