My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
401
>
2800 - Aboveground Petroleum Storage Program
>
PR0528236
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2019 10:17:33 AM
Creation date
6/19/2019 9:42:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528236
PE
2832
FACILITY_ID
FA0016613
FACILITY_NAME
RIPON USD-MAINT/OPERATIONS DEPT
STREET_NUMBER
401
Direction
N
STREET_NAME
PINE
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25905014
CURRENT_STATUS
01
SITE_LOCATION
401 N PINE ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for RIPON USD-MAINT/OPERATIONS DEPT as of June <br /> 17, 2019. <br /> Open violations from December 27,2018 inspection <br /> Violation#726-Plan failed to adequately describe overfill prevention methods for each container. <br /> The SPCC plan fails to discuss overfill prevention methods for the 1,000 gallon gasoline tank. Engineer or update <br /> each container installation in accordance with good engineering practice to avoid discharges. You must provide at <br /> least one of the following devices: <br /> (i) High liquid level alarms with an audible or visual signal at a constantly attended operation or surveillance station. <br /> In smaller facilities an audible air vent may suffice. <br /> (ii)High liquid level pump cutoff devices set to stop flow at a predetermined container content level. <br /> (iii)Direct audible or code signal communication between the container gauger and the pumping station. <br /> (iv)A fast response system for determining the liquid level of each bulk storage container such as digital computers, <br /> telepulse, or direct vision gauges. If you use this alternative, a person must be present to monitor gauges and the <br /> overall filling of bulk storage containers. <br /> (v)You must regularly test liquid level sensing devices to ensure proper operation. <br /> Amend the SPCC plan to include a discussion of all aplicable regulations from 40 CFR 112. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.