Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for RIPON USD-MAINT/OPERATIONS DEPT as of June <br /> 17, 2019. <br /> Open violations from December 27,2018 inspection <br /> Violation#726-Plan failed to adequately describe overfill prevention methods for each container. <br /> The SPCC plan fails to discuss overfill prevention methods for the 1,000 gallon gasoline tank. Engineer or update <br /> each container installation in accordance with good engineering practice to avoid discharges. You must provide at <br /> least one of the following devices: <br /> (i) High liquid level alarms with an audible or visual signal at a constantly attended operation or surveillance station. <br /> In smaller facilities an audible air vent may suffice. <br /> (ii)High liquid level pump cutoff devices set to stop flow at a predetermined container content level. <br /> (iii)Direct audible or code signal communication between the container gauger and the pumping station. <br /> (iv)A fast response system for determining the liquid level of each bulk storage container such as digital computers, <br /> telepulse, or direct vision gauges. If you use this alternative, a person must be present to monitor gauges and the <br /> overall filling of bulk storage containers. <br /> (v)You must regularly test liquid level sensing devices to ensure proper operation. <br /> Amend the SPCC plan to include a discussion of all aplicable regulations from 40 CFR 112. <br /> Page 2 of 2 <br />