Laserfiche WebLink
..,.--._ .:...__._ __ ... General Dynamic OTS (C&Inc.) • Namraous Warm Facility Permit <br /> EPA ID No.:CAD 000 626 762 April 2001 <br /> TABLE 2: AREAS OF CONCERN <br /> AOC NO. DESCRIPTION CONSTITUENTS OF RECOMMENDATIONS <br /> CONCERN <br /> 1 Photo Waste Water Tanker and silver no further investigation <br /> Spill Area <br /> 2 Pink Water Spill Area water contaminated with no further investigation <br /> TNT and other <br /> explosives <br /> 3 Site of Two Tests beryllium area be characterized <br /> 4 Fuel Storage Area diesel fuel confirmatory samples be <br /> taken <br /> 5 Diesel Fuel Leak Area diesel fuel confirmatory samples be <br /> taken <br /> SWMU Nos. 1 through 9 have been certified closed by the Department and require no <br /> further action under Part IV of this Permit. <br /> SWMU Nos. 11 through 20, AOC No. 1 and AOC No. 2 were investigated during the RFI <br /> phase and it was determined that no further investigation or remediation was required at <br /> these units. Therefore, no further action is recommended for these units. <br /> SWMU Nos. 10 and 21, and AOC Nos. 3, 4, and 5 have been investigated and reports have <br /> been submitted derailing the nature and extent of contamination. These reports include: <br /> 1) RCRA Facility Investigation, August 9, 1999; <br /> 2) RCRA Facility Investigation Field Investigation Results, February 16, 2000; and <br /> 3) Corrective Measures Study Workplan, May 11, 2000; <br /> Based on these investigations, only SWMU No. 21 and AOC No. 4 require remediation due <br /> to the presence of petroleum hydrocarbons above the approved cleanup level. Remediation <br /> will be carried out as specified in the Corrective Measures Study Workplan, May 11, 2000, <br /> with the following modification: <br /> No soils containing hazardous constituents in concentrations above the approved <br /> cleanup levels will be left on-site. <br /> D. ProiTct Coordinator <br /> 1. The Permittee's project coordinator shall be responsible for overseeing the <br /> implementation of corrective action at the Facility in accordance with this part of the <br /> 14 <br />