Laserfiche WebLink
General Dywniu OTS aria Inc.) HaraMous Wua:Facility Pemu[ <br /> EPA to No.:CAD 000 626 762 <br /> Apel 2001 <br /> of work appended to this Permit or with other guidance to be provided by the <br /> Department. The Department will review the required documents and notify the <br /> ` "- Permittee in writing of the Department's approval or disapproval, including any <br /> comments and/or modification, in accordance with Section IV.F of this permit. <br /> If the Department determines that immediate action is required, the Department's <br /> project coordinator may orally authorize the Permittee to act prior to the <br /> Department's receipt or approval of any required workplan. <br /> .. 2. RCRA Facility Investigation (RFI) <br /> The RCRA Facility Investigation Workplan and Report have been submitted to the <br /> Department and approved by the Department. <br /> 3. Corrective Measures Study (C.M.9) <br /> The "Corrective Measures Study Workplan" has been submitted to the Department and <br /> - approved by the Department. <br /> 4. Corrective Mas rr s implementation (CMI) <br /> a. The Department has evaluated corrective measure alternatives presented in the <br /> Corrective Measures Study Workplan dated May 11, 2000. Based on its <br /> evaluation, the Department approves the proposed corrective measure for <br /> implementation at the Facility. The proposed corrective measure at the facility <br /> requires removal of all contaminated soil containing contaminants above the <br /> approved cleanup levels. The corrective measure presented in the Corrective <br /> Measures Study Workplan is approved with the modification that all soils with <br /> hazardous constituents above the approved cleanup levels shall be removed <br /> without exception. <br /> b. Nothing in this Permit shall limit the Department's authority to implement the <br /> selected corrective measure(s) or to take any other appropriate action under the <br /> laws and regulation of the State of California, or any other legal authority, <br /> including the filing of a civil action seeking a judicial order directing the <br /> Permittee to implement the selected corrective measure(s). <br /> 16 <br />