My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
32727
>
2900 - Site Mitigation Program
>
PR0517291
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2019 9:56:34 AM
Creation date
6/19/2019 9:49:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517291
PE
2959
FACILITY_ID
FA0013309
FACILITY_NAME
TRACY TEST FACILITY
STREET_NUMBER
32727
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25112004
CURRENT_STATUS
01
SITE_LOCATION
32727 CORRAL HOLLOW RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�+ <br /> -' General Dymmia OTS (W.Inc.) • Hazardous Was¢Facility Permit <br /> EPA m No.:CAD 000 626 762 April 2001 <br /> H. Record Preservation <br /> 1. The Permittee shall retain, during the term of this Permit, all data, records and <br /> documents gathered or generated during activities undertaken pursuant to this part of <br /> the permit. All such documents shall be stored in a centralized location at the facility <br /> (or other location approved by the Department) and be made available to the <br /> Department or its representatives upon request. The Permittee shall notify the <br /> Department in writing at least 90 days prior to final expiration of this Permit, and shall <br /> provide the Department with the opportunity to take possession of any such records. <br /> _ Such written notification shall reference this Permit (including expiration date) and <br /> shall be addressed to the Department project coordinator. <br /> 2. The Permittee shall obtain copies of all data, records and documents gathered or <br /> generated by any agent, consultant, or contractor employed by the Permittee to carry <br /> out the terms of this part of the permit. <br /> I. D 4nnt <br /> Resolution <br /> 1. The Department and the Permittee shall use their best efforts to informally and in good <br /> faith resolve all disputes or differences of opinion. <br /> ' 2. If the Perminee disagrees, in whole or in part, with any written decision by the <br /> Department relating to Department modification of interim deliverables submitted by <br /> the Permittee or to additional work required by the Department pursuant to this part <br /> of the permit, the Permittee project coordinator shall orally notify the Department <br /> project coordinator of the dispute. The project coordinators shall attempt to resolve <br /> the dispute informally. <br /> 3. If the project coordinators cannot resolve the dispute informally, the Permittee may <br /> pursue the matter formally by placing its objections in writing. The Permittee's written <br /> objections must be directed to the Facility Permitting Branch Chief, with a copy to the <br /> Department project coordinator, within 14 days of the Permittee's receipt of the <br /> Department decision. The Permittee's written objection must set forth the specific <br /> points of the dispute and the basis for the Permittee's position. <br /> 4. The Department and the Permittee shall have 14 days from the Department's receipt <br /> of the Permittee's written objections to attempt to resolve the dispute through formal <br /> discussions. This time period may be extended by the Department for good cause. <br /> During such time period,the Permittee will have an opportunity to`meet or confer with <br /> the Department to discuss the dispute and the Permittee's objections. <br /> 5. After the formal discussion period, the Department will provide the Permittee with its <br /> written decision on the dispute. The Department's written decision will reflect any <br /> agreements reached during the formal discussion period and be signed by the Facility <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.