Laserfiche WebLink
L INSW <br /> L <br /> l 5.0 AIR MONITORING PLAN <br /> L <br /> 5.1 ACTION LEVELS FOR IMPLEMENTATION OF AIR MONITORING <br /> �„ Level Action taken <br /> Excavation of soil Monitoring during sampling when <br /> (through drillign) contaminated soil is excavated <br /> 5.2 AIR MONITORING EQUIPMENT <br /> OVA utilized to monitor total petroleum hydrocarbons, calibrated with methane. <br /> L <br /> TETRA TECH: HEALTH AND SAFETY PLAN PAGE 10 <br />