My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
34580
>
3500 - Local Oversight Program
>
PR0544584
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2019 10:21:05 AM
Creation date
6/19/2019 10:14:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544584
PE
3528
FACILITY_ID
FA0003684
FACILITY_NAME
CASTLE ROCK FIRE STATION
STREET_NUMBER
34580
Direction
S
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25118003
CURRENT_STATUS
02
SITE_LOCATION
34580 S CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 1.0 INTRODUCTION...............................................................................................................1 <br /> 2.0 SITE BACKGROUND.......................................... 2 <br /> ................................................ <br /> 2.1 Site Location and Description..................................................................................2 <br /> 2.2 Subsurface Conditions.............................................................................................2 <br /> 3.0 SUMMARY OF PREVIOUS SITE ACTIVITIES..............................................................2 <br /> 3.1 Removal of 550 Gallon Diesel Tank........................................................................2 <br /> 3.2 Livermore National Laboratories Groundwater Investigation.................................3 <br /> 4.0 PROPOSED SITE INVESTIGATION PROGRAM...........................................................5 <br /> 4.1 Approach..................................................................................................................6 <br /> 4.2 Proposed Hydropunch and Sampling Program........................................................6 <br /> L4.3 Field Quality Assurance/Quality Control Procedures..............................................8 <br /> 5.0- DELIVERABLES..............................................................................................................11 <br /> t 6.0 REFERENCES...................................................................................................................11 <br /> APPENDICES <br /> A SITE HEALTH AND SAFETY PLAN <br /> B PROJECT DATA AND REGULATORY CORRESPONDENCE <br /> C SOIL SAMPLING PROCEDURES <br /> FIGURES <br /> 1 SITE LOCATION MAP......................................................................................................4 <br /> 2 SITE MAP ...........................................................................................................................5 <br /> 3 BORING LOCATION MAP...............................................................................................7 <br /> TETRA TECH:Castle Rock Forest Fire Station,Revised Technical Work Plan Page i <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.