Laserfiche WebLink
L <br /> L 12.0 MEDICAL SURVEILLANCE PR <br /> OGRAM <br /> Prior to assignment to any task requiring a level of personnel protection above level D, personnel <br /> Lwill submit, if required by the Tetra Tech project manager, evidence that they have received and <br /> have passed a physical examination within the previous twelve months which incorporates the <br /> Lfollowing: <br /> L • An occupational and general physical history. , <br /> • Complete physical examination which incorporates the head, torso, abdomen , limbs, and <br /> L musculo-skeletal systems. <br /> L • Chest X-ray <br /> • Pulmonary function test. <br /> L • Audiometric exam for persons working around drill rigs. <br /> • Laboratory testing of blood and urine to include the following: C.B.C., albunim phosphatase, <br /> total bilirubin, SGOT, SGPT, cholesterol, total protein, albumin, globulin, A/G ratio, BUN, <br /> and creatinine <br /> L • Vision test. <br /> • Electrocardiogram <br /> L 12.1 HEAT STRESS MONITORING <br /> RING <br /> LTo aid in the prevention of heat stress, the following will provided for personnel working at the <br /> site, if required: <br /> • Potable Water <br /> =:> Fresh water <br /> => Potable water with 1% salt or commercial mix (such as gatorade) will be within <br /> easy access to all workers. <br /> TETRA TECH: HEALTH AND SAFETY PLAN PAGE 20 <br />