Laserfiche WebLink
Jeff Wong [EH] <br /> From: Charles Daggs <cdaggs@mandsinc.com> <br /> Sent: Tuesday, March 19, 2019 12:23 PM <br /> To: Jeff Wong [EH] <br /> Cc: Ed Gorton; Michael Kith [EH]; Kevin Holben <br /> Subject: RE: LBA Schulte Rd. - Conditional Operation of Septic System <br /> Jeff, <br /> Once we're near completion of the project (within the next 30days) we'll inspect the septic tank for our Civil Engineer <br /> Kier&Wright so that they can provide the letter. We understand the requirements as you noted back in your <br /> November email. <br /> "PLEASE NOTE: As of March 1 st, Millie and Severson's Pleasanton office has moved to 5635 West Las <br /> Positas Blvd., Suite 406, Pleasanton, CA 94588. All phone numbers will remain the same" <br /> Charles Daggs I LEED AP BD+C I Project Manager <br /> 5635 W. Las Positas Blvd. (925)227-0700 x 120 <br /> Suite 406 (925)227-0703 F <br /> Pleasanton,CA,94588 (510)708-2010 M <br /> cdaggs@mandsinc.com <br /> LOS ALAMITOS MILLIE and <br /> ONTARIO SIVIRSOR <br /> PLEASANTQN <br /> GENERAL CONTRACTORS <br /> From:Jeff Wong [EH] <Jwong@sjcehd.com> <br /> Sent:Tuesday, March 19, 2019 10:46 AM <br /> To:Charles Daggs<cdaggs@mandsinc.com> <br /> Cc:Greg Mallcheck<GMallcheck@mandsinc.com>; Ed Gorton<EGorton@mandsinc.com>; Michael Kith [EH] <br /> <mkith @sjcehd.com>; Kevin Holben <KHolben @mandsinc.com> <br /> Subject: RE: LBA Schulte Rd. -Conditional Operation of Septic System <br /> Charles: <br /> Just a remainder, I have not received a signed and stamped letter from an engineering firm that the septic system would <br /> work(see 11/19/18 email below)to date. Again, EHD would not be able to sign off on Final Occupancy if that is not <br /> met. Please beware this regards only the septic portion (water is a separate issue). <br /> I did received photos inside the tank from your previous email dated 11/27/18. Thank you. <br /> Best Regards, <br /> 1 <br />