My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011650
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
0
>
2900 - Site Mitigation Program
>
PR0521409
>
ARCHIVED REPORTS XR0011650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 1:39:58 PM
Creation date
6/20/2019 11:44:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011650
RECORD_ID
PR0521409
PE
2950
FACILITY_ID
FA0014531
FACILITY_NAME
PLYMOUTH ROAD STORM DRAIN PROJECT
STREET_NUMBER
0
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
0 COUNTRY CLUB BLVD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' k'q KLEINFELDER <br /> B-3 4 Well Survey <br /> ' The locations of soil bonngs and monitoring wells, and the elevation of the top of the PVC <br /> casings are usually surveyed and tied into permanent markers, if readily available Survey <br /> accuracy is 0 1 foot for the "x" and "y" coordinates and 01 foot for the "z" coordinate The <br /> depth to static groundwater is measured from a set location at the top of the PVC casing(usually <br /> the north nm) The depth of water is then subtracted from the elevation of the top of the well <br /> casing to provide a groundwater elevation for each monitonng well location <br /> 1 <br /> B-4 GROUNDWATER MONITORING <br /> ' <br /> 8-4.I Water Level Measurements <br /> ' Water level measurements are made in the wells pnor to purging and sampling the wells <br /> Measurement protocol is as follows <br /> I , 1 Prior to obtaining water level measurements, the monitoring wells would be opened and <br /> allowed to equilibrate for a period of approximately %2 hour <br /> S2 The water level probe is decontaminated in a tnsodium phosphate or non-phosphate <br /> detergent wash, followed by a distilled water rinse, prior to use in each well <br /> 3 Water level measurements are made using a conductivity-based water-level meter <br /> Depth-to-water is generally measured from a surveyed mark on the north rim of the PVC <br /> ' well casing <br /> The water level measurements are converted to elevations using the surveyed casing elevations <br /> ' B-4 2 Groundwater Sam lin <br /> Groundwater samples are collected from the monitoring wells at the site The sampling protocol <br /> ' for each well is as follows <br /> ' 1 Down-well equipment (pumps, bailers, etc ) is decontaminated by steam cleaning, or by <br /> scrubbing in a tnsodium-phosphate or non-phosphate detergent wash followed by a <br /> distilled water rinse, prior to use in each well Bailer cord is replaced pnor to use in each <br /> well <br /> 2 The depth to groundwater is measured using a conductivity-based water-level meter <br /> ' 3 The volume of water in gallons standing in the well is calculated by subtracting the depth <br /> to groundwater measurement from the depth of the well and multiplying by the <br /> appropriate conversion factor (0 16 for 2-inch wells, and 0 65 for 4-inch wells) <br /> 4 Three to five well volumes of water are purged from each well using a submersible <br /> pump, bladder pump, or Teflon bailer <br /> 28699 EOI /ST03R793 Page B-5 <br /> Copyright 2003,Kleinfelder,Inc July 21,2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.