Laserfiche WebLink
i <br /> S P E C I A L P R O V I S I O N S <br /> Winter Weather Utility Work <br /> ' 1. SUPERVISION: The utility company (permittee) shall furnish <br /> ul -tnte supervision of all work to insure full compliance <br /> with the permit provisions. _ <br /> 2. START OF WORK: No work within the County right of way shall <br /> e starteH until the utility company representative has made <br /> ' an evaluation of weather conditions and has determined the <br /> work can be accomplished tinder the provisions of the permit. <br /> ' 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the <br /> pavement outside the area of work, and if inadvertently track- <br /> ed onto the road travelway shall be removed immediately. <br /> 4 . DAILY RESTORATION: Private driveways and road intersections <br /> s al a restored daily. <br /> ' S. WEATHER-TIGHT CONDITION: All trenches shall be filled and <br /> compacted, itc es an other drainage facilities regraded <br /> and opened, and the entire work area restored to weather- <br /> tight condition prior to any rain. <br /> 1 <br /> 1 _ - <br /> I <br /> u/1 Y Til <br />