My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011654
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
0
>
2900 - Site Mitigation Program
>
PR0521409
>
ARCHIVED REPORTS XR0011654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 1:32:23 PM
Creation date
6/20/2019 11:47:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011654
RECORD_ID
PR0521409
PE
2950
FACILITY_ID
FA0014531
FACILITY_NAME
PLYMOUTH ROAD STORM DRAIN PROJECT
STREET_NUMBER
0
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
0 COUNTRY CLUB BLVD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kn KLEINFELBER <br /> Approximately 5 to 10 well volumes are generally removed from each monitoring well <br /> ' Discharge water is stored in 55-gallon drums and left on site for later discharge or disposal by <br /> the client, depending on laboratory results The drums are labeled with the date, well number, <br /> and a contact person and phone number <br /> ' A-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is washed <br /> ' In a tnsodium phosphate or non-phosphate detergent solution and rinsed in distilled water or <br /> steam cleaned prior to use in the next monitoring well <br /> 1 <br /> ' A-3 4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the PVC <br /> ' casings are usually surveyed and tied Into permanent markers, if readily available Survey <br /> accuracy is 0 1 foot for the "x" and "y" coordinates and 01 foot for the "z" coordinate The <br /> depth to static groundwater is measured from a set location at the top of the PVC casing (usually <br /> the north nm) The depth of water is then subtracted from the elevation of the top of the well <br /> ' casing to provide a groundwater elevation for each monitoring well location <br /> ' A-4 GROUNDWATER MONITORING <br /> ' A-4.1 Water Level Measurements <br /> Water level measurements are made in the wells pnor to purging and sampling the wells <br /> ' Measurement protocol is as follows <br /> 1 Prior to obtaining water level measurements, the monitoring wells would be opened and <br /> allowed to equilibrate for a period of approximately %z hour <br /> ' 2 The water level probe is decontaminated In a trisodium phosphate or non-phosphate <br /> detergent wash, followed by a distilled water rinse, prior to use in each well <br /> I <br /> 28699 EOI /ST03R627 Page A-6 <br /> ' Copynght 2003,Klemfelder,Inc Apni 22,2003 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.