-1 <br /> K L E I N F E L D E R <br /> Shored Eicai arz ons <br /> In areas where existing site features interfere with temporary sloped excavations, we anticipate <br /> trench and/or jacking pit excavations will be shored As indicated earlier, the soils encountered <br /> during our field exploration consisted of stiff to hard clays and silts with interbedded layers and <br /> strata of loose to medium-dense, potentially caving or sloughing sands Accordingly, the <br /> Contractor should exercise care during excavations at the site y Where ` clean" sands are <br /> encountered, excavations will require continuous or solid-type shoring (e g , interlocking sheet <br /> piles or similar system) during excavation Conventional shonng, such as intermittent trench <br /> jacks may not adequately q ely support excavation walls Furthermore, the "clean sands may not <br /> stand vertically long enough to move shoring into place following excavation Shoring should <br /> be removed as backfilling progresses <br /> Shoring should be designed to resist the earth pressure exerted by the retained soil plus any <br /> additional lateral force due to surcharge loading, i e , construction equipment, foundations, <br /> roadways, etc , at or near the shonng The following equivalent fluid earth pressures are <br /> recommended assuming a maximum shoring height of 30 feet, a level ground surface, an <br /> effective soil uiut weight of 120 pcf, and a fully drained soil condition <br /> Earth Pressure Earth Pressure Lateral Earth <br /> Condition Coefficient Pressure ( ef) <br /> Active 035 39 <br /> iAt-Rest 0 52 58 <br /> Passive 288 315 <br /> Lateral soil pressure diagrams for braced shoring in cohesive clays or silts and cohesionless <br /> sands and gravel are presented on Plate 2 The lateral pressure diagrams assume temporary <br /> excavations are properly dewatered and do not account for surcharge loads or vibration due to <br /> stockpiled soils, construction equipment, building loads, or vehicle traffic The Contractor <br /> should consult with an experienced consultant to design the required shoring systems prior to <br /> earthwork activities <br /> Const-uctiorr Dewatering <br /> i <br /> We anticipate the bottom of the trench will be less than 25 feet below the existing site grade <br /> this corresponds to a depth of about 181,', feet below the highest groundwater level encountered <br /> during our field investigation During construction of the trench, soils exposed below the <br /> groundwater level could become unstable or even "quick ' due to upward seepage forces <br /> loosing their ability to support foundations and maintain stabile trench slopes Therefore, we <br /> anticipate that dewatering will be necessary to permit stable construction The groundwater <br /> should be lowered and continuously maintained at least 3 feet below the bottom of the <br /> proposed excavation until the structure and backfill weight is adequate to provide uplift <br /> resistance and backfill is complete at least 3 feet above the normal stabilized water level <br /> 13629 001,2002R369 -�prll 19 200 <br /> "J 2002 Kleinfelder Inc <br /> Page 6 of 16 <br />