My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1267
>
2900 - Site Mitigation Program
>
PR0505602
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 2:46:40 PM
Creation date
6/20/2019 1:39:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505602
PE
2950
FACILITY_ID
FA0006891
FACILITY_NAME
BANK OF THE WEST
STREET_NUMBER
1267
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
11304217
CURRENT_STATUS
02
SITE_LOCATION
1267 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIT IV LOP <br /> LTCP NO FURTHER ACTION (NFA) CLOSURE CHECK LIST <br /> 8/20/13 Jlf <br /> SITE ADDRESS: !Z / �Cu v�-�-�zu y DATE: ` J <br /> SITE NAME: LOP STAFF: <br /> ,, JHS— k.1t.W-Y- <br /> U, REQUEST FOR CLOSURE (AKA NFA) up loaded into GT by RP/consultant, within 60 days LOP staff reviews and <br /> receipts ESI with link to regulator's response in GT. If Staff verifies site meets LTCP closure criteria, then gain PG's <br /> concurrence. PG saves LTCP check list as"FINAL", "READY/ELIGIBLE FOR CLOSURE"in GT. <br /> LOP Staff verified GeoTracker(GT) "Closure Review" screen still marked "No" at"Is This Case Ready for Closure?" <br /> '4I Ct <br /> I1 OP Staff advises CVRWQCB of NFA consideration to prepare for Unit meeting. <br /> ���� ►z d 'S <br /> LLoP' St�'a f asks RP consultant's for Tri-Regional Appendix A submittals to GT of: Time to reach WQG, Initial and <br /> 22 <br /> removed mass estimates, soil vapor study (if applicable). Submittals received on: �� RB notified on <br /> '0 (7tOP�staff and PG/PC discuss NFA and LTCP READY FOR CLOSURE consid ration with CVRWQCB at Unit Meeting, <br /> y phone, or e-mail. RB informally concurs on /RB requires: d 15¢�Dlc� <br /> G a t rv�Fk_ i - t oncur w/closure. <br /> va1I I4OP Staff drafts Case Closure Summary (CCS) and CCS is reviewed by 'third party' staff member: U6,1L 4, <br /> Ilk <br /> ��11 LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA that includes the CCS. <br /> LA � �� LOP Staff submits 30-day CVRWQCB letter w/CCS and file to PC for review and sl* nature. <br /> CVRWQCB 30-day response date up on: I_tj / concurrence received on: B requests extension <br /> to: Non-concurrence letter from CVRWQCB Management received on: Staff up loads EHD letter <br /> tj'L�f/�to CVRWQCB without CCS and CVRWQCB concurrence for closure letter in GT on <br /> Staff or consultant prepares 60 day Public Participation Notice (PPN). kg WBfl <br /> �t 1 Finalize sent/posted notifying effected properties and adjacent properties. 60 days up on OC <br /> PPN sent to city/county Building Dept& water purveyor. 60 days up on <br /> Name &Address list of all recipients (confidential) and PPN filed in LOP file. PPN up loaded into GT on / <br /> g _ Documentation received, filed, and flagged that indicates the "current record owner(s) of fee title to the site have <br /> been notified", per Section 25297.15 (a). The NFA closure letter may not be issued without this documentation. <br /> LOP Staff directs RP to destroy all MWs, remove all waste material & provide documentation of proper waste <br /> disposal. LOP staff reviews and approves work plan for well destruction. <br /> MW Destruction permits issued (after 60 days of PPN) & Johnny notified of impending work. <br /> `T LOP Staff documents destruction of all MW. GT "Groundwater Monitoring" screen updated to indicate wells are <br /> destroyed. The NFA closure letter may not be issued until MWs are destroyed.(1/u(J' <br /> LOP Staff verifies and flags documentation received indicating all onsite wastd material removed and properly <br /> disposed and verified with EHD accounting all SR& D site fees have been paid. The NFA closure letter may <br /> not be issued without this documentation. GT"Closure Review" screen marked "Yes" at"Is This Case Ready <br /> for Closure?" <br /> LOP Staff asks clerical to prepare NFA& CCS for Director's signature within 30 days of MW destroyed and <br /> waste material properly disposed, & provides RPs name and addresses to be sent original NFA. PG/PC <br /> reviews file with flagged documents and approves issuance of NFA letter by Director. Signed CCS and NFA <br /> are copied. Originals mailed to RPS. Copies filed into LOP File, PC, and staff to upload into GT. <br /> Clerical staff updates Envision to reflect site is Closed. <br /> LOP staff pulls all site files for clerical staff to file in LOP Closed File cabinets, until scanned into Questys. <br /> LOP staff updates GT"Project Information" screens to reflect site status as Closed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.