My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1267
>
2900 - Site Mitigation Program
>
PR0505602
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 2:46:40 PM
Creation date
6/20/2019 1:39:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505602
PE
2950
FACILITY_ID
FA0006891
FACILITY_NAME
BANK OF THE WEST
STREET_NUMBER
1267
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
11304217
CURRENT_STATUS
02
SITE_LOCATION
1267 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 6 <br /> as for 10/18 air knife AND CPT???? once again....I need to see CPTs, not air <br /> knife-is this going to be two crews on site, as in concurrent work or air knife first <br /> then do the CPT? No different in fees due, just how long I standby waiting for your <br /> call. either way, CPT-10 permit for offsite on Elmwood during normal work <br /> days/hours can be based on regular fees. the $488 already submitted should <br /> cover THAT boring/permit. Call me out when the CPT push begins. <br /> This now leaves 2 or 3 Sundays for ONSITE work ONLY, right? If not, clear this <br /> up. <br /> if so, then only $427 is needed for the onsite permit. I'm NOT charging you for 2 or <br /> 3 Sundays. The fees allow for multiple hours and how many Sundays you get is <br /> based on how many hours I spend during each. Each Sunday has a minimum <br /> charge of three hours. me out there more than three hours will start an hourly <br /> clock. onsite permit now has 7 hours credited to it, and I'm spending it all the time <br /> dealing with this preparation to issue. <br /> and I need the CRA confirmation letter/note with a signature that any/all additional <br /> charges these permit fees do not cover will be paid by CRA within 30-days of our <br /> billing notice. <br /> and so it doesn't become a misunderstanding, the EHD is too be notified if any <br /> changes from this 'plan' are made..understood? as soon as you or Shell or the <br /> property owner or the driller CHANGE this schedule, notify me immediately.. <br /> From: Murphy, Mike [mailto:mrmurphy@craworld.com] <br /> Sent: Thursday, October 07, 2010 3:48 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: 1267 Country Club <br /> Sorry for the confusion Mike— Dayna was supposed to give you the dates. <br /> Sunday 10/17 airknife onsite <br /> Monday and Tuesday 10/18-19 Airknife and CPT boring in Elm Street <br /> Sunday 10/24, 10/31, and 11/7 (if needed) complete vapor wells and CPT work onsite <br /> We'd rather not work on Sundays, but with property owner/tenant issues, we have no choice. <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Thursday, October 07, 2010 3:24 PM <br /> To: Murphy, Mike <br /> Subject: RE: 1267 Country Club <br /> well yeah... <br /> this schedule thing needs to get finalized and soon. <br /> I wasn't told Sundays-then I'm told Sundays-now I'm told some Sundays and <br /> some weekdays. <br /> you get me a written schedule...I'll review and get back to you with fees. <br /> 10/900110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.