Laserfiche WebLink
Page 6 of 6 <br /> the billing statement we send to CRA. <br /> with these items adequately addressed by October 13, 1 will be <br /> able to issue the two permits and you can be able to meet your <br /> schedule for the first day for this phase, Sunday,October 17. <br /> As I explained to Dana, the EHD will inspect soil vapor probe <br /> installations and surface seal testing, CPT advancement and <br /> sample collection, as well as CPT grouting/destruction <br /> procedures. On Sundays these activities are planned, the EHD <br /> staff inspector is to be called prior to the work being done. The <br /> EHD does not need to inspect the air knifing/hole clearing <br /> procedures. Please keep me informed of the work you plan each <br /> Sunday as soon as you have determined it. My response time to <br /> the site can be within a half hour of the call from your CRA field <br /> personnel. <br /> thank you. <br /> mike <br /> 10/8/2010 <br />