Laserfiche WebLink
Shell Station (former) page 3 <br /> 1267 Country Club Blvd, Stockton <br /> Work plan addendum comment <br /> Please be advised that any contaminants found in grab ground water samples <br /> are to be further investigated by installing a monitoring well screen at that depth. <br /> Multiple impacted depths require screened intervals placed at each zone for <br /> further sampling. <br /> There is adequate subsurface lithological data available in the waste oil UST <br /> area to support monitoring well discrete screen installations now. Instead of <br /> placing CPT-8, EHD will require two monitoring wells to be placed at this time. A <br /> discrete screen is required at 40-45 feet bgs and another at 69-74 feet bgs, <br /> clustered in the area of where CPT-8 was to be placed. If repeatable ground <br /> water sampling reveals any of the above noted analytes are detected, additional <br /> lateral and deeper screened monitoring wells may be needed. <br /> The Addendum noted that a report was to be submitted after laboratory results <br /> are received. EHD hereby directs Shell to submit the report of findings in the <br /> format of a Site Conceptual Model (SCM). Multiple cross-sections shall be <br /> included that clearly show lithological interpretations for the site based on the site <br /> boring logs. Superimposed over the bore log information in the cross-sections <br /> shall be soil and ground water data for contaminants detected to date. Several <br /> cross-sections may be needed to fully interpret the site conditions. Iso- <br /> concentrations maps for each sand zone shall be included that show zero lines <br /> as supported by data. TPH (as gas, diesel, oil and grease, and motor oil) MtBE, <br /> 1 ,2-DCA, BTEX, and all of the waste oil UST constituents shall be mapped on as <br /> many iso-con maps as needed to model the site and provide an understanding <br /> of the dispersion and zero-lines of the contaminant mass. Areas where data is <br /> not available to support delineation conclusions shall be discussed in the <br /> recommendation and conclusion section of the SCM. A professional geological <br /> interpretation of the nature and extent of the contamination shall be included in <br /> the SCM. <br /> The Addendum is not approved as submitted. A revision is required. <br /> Shell is hereby directed to submit a work plan by August 15, 2005 to install <br /> at least two monitoring wells in the area just northeast of the former waste <br /> oil UST. A screened interval is to be constructed at each of the two sand <br /> intervals (-40-47 feet bgs and 69-75 feet bgs). No soil sample collection or soil <br /> analysis was proposed in the Addendum. Shell is to collect and analyze an <br /> adequate number of soil samples so that conclusions of delineation and mass <br /> (balance, transport, etc) required in the SCM can be supported. <br />