Laserfiche WebLink
C A M B R 8 A Mr Michael Infurna <br /> • October 7, 2005 <br /> ANTICIPATED FOURTH QUARTER 2005 ACTIVITIES <br /> Groundwater Monitoring Blaine will coordinate quarterly sampling events with the former BP <br /> station, gauge and sample the site wells according to the existing sampling schedule, and tabulate <br /> the data Cambria will prepare a groundwater monitoring report <br /> Site Investigation Upon receiving approval of the work plan addendum from SJCEHD, Cambria <br /> will proceed with installing approved well S-7 and proposed wells S-8 and S-9 <br /> RECOMMENDATION <br /> As requested in previous reports, Cambria requests that total petroleum hydrocarbons as diesel <br /> analyses be reduced to annual If SJCEHD concurs with this recommendation, Cambria will <br /> implement the change beginning with the fourth quarter 2005 sampling event <br /> • <br /> 2 <br />