Laserfiche WebLink
• • <br /> C A M B R A Mr Michael Infurna <br /> April 6, 2005 <br /> Cambria will perform the scope of work described in this work plan under the supervision of a <br /> professional geologist <br /> SCHEDULE <br /> Cambria will begin work upon written approval of this work plan by SJCEHD and receipt of an <br /> appropriate chilling permit We will drill proposed boring SB-6 in conjunction with the installation <br /> of proposed well S-7 <br /> CLOSING <br /> If you have any questions regarding the scope of work outlined in this work plan, please call <br /> Aubrey Cool at(510)420-3336 <br /> i <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Aubrey K Cool, R G <br /> Project Geologist <br /> Matthew W Derby, P E <br /> Senior Project Engineer ''©p <br /> Figures 1 - Site Vicinity/Well Survey Map <br /> 2 - Site Plan/Proposed Boring Location Map <br /> cc Dems Brown, Shell Oil Products US, 20945 S Wilnungton Ave , Carson, CA 90810 <br /> James Barton, Central Valley Regional Water Quality Control Board, 11020 Sun Center <br /> Drive, #200, Rancho Cordova, CA 95670 <br /> Darin Collins (Property Owner), Collins Appraisal, 1036 W Robin Hood Drive, Suite 209, <br /> Stockton, CA 95207 <br /> G\Stockton 1267 Country Club Blvd\WORK PLAN51Resp let-work plan add 4-0510443 Resp let-Work Plan 4-05 doc <br /> 7 <br />