Laserfiche WebLink
CAIVIBRIA <br /> ANTICIPATED SECOND QUARTER 2004 ACTIVITIES <br /> Blaine will coordinate quarterly sampling events with the Tosco station, gauge and sample the <br /> site wells according to the existing sampling schedule, and tabulate the data Cambria will <br /> prepare a groundwater monitoring report <br /> Cambria submitted a work plan to SJCEHD on April 30, 2004 as requested <br /> RECOMMENDATIONS <br /> Because monitoring wells S-1, S-2, and S-4 through S-6 have not contained detectable <br /> concentrations of 1,2-DCA,Cambria recommends that this analysis be discontinued <br /> Cambria also requests that TPHd analyses be reduced to annual If SJCEHD concurs with these <br /> recommendations, Cambria will implement the changes beginning with the second quarter 2004 <br /> sampling event <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (S 10) 420-3336 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc, <br /> �a 4----1 <br /> Aubrey K Cool d4"t— <br /> Project Manager9 <br /> _ <br /> GE <br /> W. O wyl� <br /> Qh�eN AFF% <br /> Joe W Neely,RG <br /> Senior Project Geologist ° No 6927 ° <br /> RG 6927 <br /> OFC <br /> i <br /> 0943 2 <br />