Laserfiche WebLink
CAMBRIA <br /> schedule and subrrut the samples to a State of California certified laboratory for chemical <br /> analyses <br /> Chemical Analyses Groundwater samples from all the wells will be analyzed for TPHd with <br /> silica gel cleanup by EPA Method 8015 (Modified) and TPHg, BTEX, and 1,2-DCA by EPA <br /> Method 8260 <br /> Wellhead Survey Activities Following monitoring well installation, a licensed surveyor will <br /> survey wellhead elevation relative to mean sea level and the latitude and longitude of the well <br /> location <br /> Report Preparation:Following the receipt of analytical results from the laboratory, Cambria will <br /> prepare a written report which will include field procedures, laboratory results, a boring log, and <br /> conclusions <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> I <br /> registered geologist <br /> • SCHEDULE <br /> Cambria is prepared to begin work upon written approval of this work plan by SJCEHD and <br /> receipt of an appropriate drilling permit <br /> • <br /> 0943 7 <br />