Laserfiche WebLink
r � <br /> C A M B R I A <br /> ANTICIPATED FIRST QUARTER 2004 ACTIVITIES <br /> Blaine will coordinate quarterly sampling events with the Tosco station, gauge and sample the <br /> site wells according to the existing sampling schedule, and tabulate the data Cambria will <br /> prepare a groundwater monitoring report <br /> On August 4 through 6, 2003, Cambria completed the cone penetration test borings proposed in <br /> our November 12, 2002 Response Letter/Sate Conceptual Model/Sate Investigation Work Plan <br /> The findings of this investigation will be reported under separate cover <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (510)420-3336 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Aubrey Cool <br /> Project Manager ED GF�� <br /> 9LA/" `�.SC`p`'�e A W �FOcs <br /> Joe W Neely, RG a <br /> Senior Project Geologist No b927 <br /> RG 6927 ��- <br /> OF CALICA <br /> • <br /> 0943 2 <br />