My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2900 - Site Mitigation Program
>
PR0505513
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 4:09:43 PM
Creation date
6/20/2019 3:34:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0505513
PE
2950
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
02
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> CERTIFICATION` <br /> Information, conclusions,and.recommendations contained in this Well Destruction Work Plan were prepared <br /> under the supervision of a Cardno ATC. California Registered Professional. <br /> Prepared by <br /> Mi S <br /> Project Manager <br /> for Cardno ATC <br /> Direct Line+1 209 579 2221 PQfESS/O <br /> Email: mike.sonke(cDcardno.com Oe JEANNE <br /> HOMSEY 2G� <br /> Reviewed,by _. - No. C04741,0 <br /> Exp. <br /> I <br /> Jea a Homsey; P.E.- r_�__ _ ... F=OF CA1,\F��` e� _ <br /> California-Registered Professional Engineer — — - <br /> for Cardn6 ATC_ <br /> Direct Line+1 209 579 2221 _ <br /> F ' Email: eanne.homsevCa�caidno.com ^ <br /> cc: Ms. Sharon Evans, Phillips 66 (electronic copy) <br /> Mr. Jane Bohn,Atlantic Richfield Company, a BP Affiliated Company(electronic copy) <br /> enclosures: Figure:1 Site Location Map <br /> Figure 2 Detailed Site Plan <br /> Table 1 Well Construction Method Determination <br /> A professional engineer's certification of conditions comprises a declaration of his or her professional <br /> judgment. It does not constitute a warranty or guarantee, expressed or implied, nor does it relieve any other <br /> party of its responsibility to abide by contract documents,applicable codes, standards, regulations, and <br /> ordinances. <br /> Australia • Belgium •.Canada • Ecuador •Germany • Indonesia + Italy • Kenya <br /> New Zealand • Papua New Guinea • Peru • Tanzania • United Arab.Emirates <br /> United Kingdom • United States • Operations in 85 countries <br />
The URL can be used to link to this page
Your browser does not support the video tag.