Laserfiche WebLink
` N%0_01 `WV <br /> Pagel of 2 <br /> Mike Infurna [EH] <br /> From: Ben Chevlen [ben.chevlen@atcassociates.com) <br /> Sent: Thursday, April 21, 2011 2:54 PM <br /> To: Mike Infurna [EH] <br /> Subject: ATC's comments regarding the status of several sites formerly managed by other consultants <br /> Mike–As we have discussed on the phone, ATC has taken over management of several sites (discussed below) <br /> which are currently being overseen by yourself. Below, I am presenting a summary of what ATC understands to <br /> be the current status of each site,what work has been proposed and is pending, if ATC feels changes to the <br /> proposed work are warranted, and what ATC sees as potential obstacles to reaching case closure. <br /> Circle K 1205–16470 Cambridge Dr., Lathrop <br /> • Current status–An ozone sparge pilot test is currently being performed on-site;the results of which <br /> will be documented in a report being prepared by Stantec, which will be submitted to the SJCEHD by <br /> 4/22/11. Pending results of the pilot test,ATC will evaluate the appropriateness of expanding the <br /> ozone sparge system to address impact off-site to the north. An SVE system was started up at the site <br /> during 1Q10 and is currently operating (being operated by Stantec; ATC will assume operation once all <br /> necessary permits are in place); influent concentrations have attenuated significantly(recovery rates <br /> during 4Q10 averaged 2lb/day). Groundwater sampling currently being performed semi-annually <br /> during 1Q/3Q. <br /> • Proposed and pending work–Stantec to prepare a report documenting completion of ozone sparge <br /> pilot test. Stantec also to prepare 1Q11 remedial system O&M report and 1Q11 groundwater sampling <br /> report. <br /> • ATC's recommended changes to proposed work– None;ATC feels the work currently under way is <br /> appropriate. ATC will review the results of the ozone sparge pilot test to determine if expanded <br /> implementation of ozone sparging off-site to the north is appropriate. <br /> • Potential obstacles towards closure–Elevated TPHg concentrations in off-site well MW-12, and lack of <br /> delineation of MTBE north of MW-16 may represent obstacles to closure. A more detailed review of <br /> subsurface conditions and risk drivers is needed to determine the best approach to dealing with these <br /> issues. <br /> 76(Former BP)Station No. 11192–1403 West Country Club Blvd.,Stockton <br /> �� • Current status–GW sampling semi-annual during 1Q/3Q;a KVA ozone sparge system has been <br /> operating at the site since 2003. Majority of GW impact on neighboring Shell property cross Pershing <br /> Ave.to the east and north of the neighboring Shell property. — bzt'&) °A <br /> ,� • Proposed and pending work–Stantec prepared a work plan dated 3/10/11 to advance 2 on-site CPT <br /> soil borings and 3-4 off-site CPT borings; ATC is designated to perform the work. / 713 <br /> • ATC's recommended changes to proposed work–ATC questions theappropriateness of advancing off- <br /> site CPT borings CPT-5, CPT-6 and CPT-9. ATC questions the relevance of proposed boring CPT-5,.due to <br /> the relatively low to non-detect groundwater concentrations in adjacent Shell monitoring welirS-S.,ATC <br /> is unclear why proposed boring CPT-6 is justified, considering the continued lack of detections in GW9: <br /> samples collected from well MW-9. As for proposed boring CPT-9, ATC recommends that the results of <br /> CPT boring CPT-4 be fully evaluated before performing any additional assessment further down- <br /> gradient of the site. Additionally,ATC would like to clarify that while Stantec's work plan indicates that �Yr <br /> monitoring wells will be installed if the results of the CPT assessment indicate additional monitoring A"n _ <br /> wells are warranted,ATC will make such a recommendation in the report documenting the CPT <br /> assessment(a separate stand-alone well installation work plan would be submitted, pending SJCEHD <br /> concurrence). Please note,ATC respects the fact that Stantec's 3/10/11 work plan has been approved <br /> 4/22/2011 <br />