Laserfiche WebLink
UNIT IV LOP <br /> NO FURTHER ACTION (NFA) CLOSURE CHECK LIST <br /> 9/1 /12 <br /> SITE ADDRESS: 1A03 ret, ti C/G.(� <br /> LOP STAFF: l/� <br /> a <br /> SITE NAME: <br /> DATE: <br /> NFA requested by RP or LOP Staff reviewed site with PG and determined it qualifies for NFA. <br /> LOP Staff verified GeoTracker(GT) "Closure Review" screen still marked "No" at"Is This Case Ready for Closure?" <br /> LOP Staff advises CVRWQCB of NFA consideration. <br /> '��✓� LOP staff and PG/PC discuss NFA consideration with CVRWQCB at Unit Meeting, by phone, or e-mail. <br /> LOP Staff drafts Case Closure Summary (CCS). <br /> 8-513 LOP Staff has CCS verified by `third party' staff member. CCS Reviewed by Yl`! <br /> LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA that includes the CCS. <br /> LOP- Staff-submits 30-day.CVRWQCB NFA with CC-to water.purveyor-to PC for review and signature. _ . <br /> Copy of 30-day letter and CCS sent to: / �' (name of water purveyor) <br /> CVRWQCB 30-day response date up on: D/ oncurrence received on: <br /> 30-day extension requested to: Non concurrence letter from CVRWQan geme t <br /> 'received on: Staff up loads CVRWQ letter without CCS into GT on <br /> which begins Public Participation Notice notification of ays.�OC <br /> Documentation received, filed, and flagged that indicates the"current record owner(s) of fee title to the site have <br /> been notified", per Section 25297.15 (a). The NFA closure letter may not be issued without this <br /> documentation. :IWL ��,9113. <br /> L Staff directs RP to destroy all wells, remove all site waste material, and provide documentation the waste <br /> materia as properly disposed, LOP staff reviews and approves work plan for well destructio estruction permits <br /> issued after days of posting of the Closure Public Notice. Permits issued on <br /> LOP Staff documents truction of all monitoring wells. GT"Groundwater Mo oring"screen updated to indicate <br /> wells are destroyed. The closure letter may not be issued until w s are destroyed. <br /> LOP Staff verifies and flags docume tion received indicating nsite waste material removed and properly <br /> disposed and verified with EHD accounts all SR& D site s have been paid. The NFA closure letter may <br /> not be issued without this documentation. T"Clos e Review" screen marked "Yes" at"Is This Case Ready <br /> for Closure?" <br /> -r 'PC reviews file with flagged documents LOP Sta nd approves clerical issuance of NFA and CCS for <br /> IJ, or's signature. <br /> LOP staff provides name and add sses of all RPs to the Clerical. Cle * I generates a NFA and GCS to be signed <br /> by Director for each RP (not c sultants). NFA& CCS generated only if PC signed off above. Signed CCS <br /> and NFA are copied. Ori ' s mailed to RP. Copies filed into LOP File, given Management, and given to staff to <br /> upload into GT. <br /> Clerical staff u tes Envision to reflect site is Closed. <br /> LOP s pulls all site files for clerical staff to file in LOP Closed File cabinets until scanned into estys. <br /> OP staff updates GT"Project Information" screens to reflect site status as Closed. <br />