Laserfiche WebLink
+i 0 - <br /> TABLE 1-SUMMARY OF RESULTS OF GROUNDWATER SAMPLING <br /> BP OIL COMPANY SERVICE STATION NO.11192 <br /> 1403 COUNTRY CLUB BOULEVARD,STOCKTON,CALIFORNIA <br /> ALISTO PROJECT N0.10.037 <br /> WELL DATE OF CASING DEPTH TO GROUNDWATER TPH-G B T E X DO LAB <br /> ID SAMPLING/ ELEVATION (a) WATER ELEVATION (b) (ppb) (ppb) (ppb) (ppb) (Ppb) (ppm) <br /> MONITORING (Feet) (Feet) (Feet) <br /> MW-5 08/05/91 6.15 30.72 -24.57 ND ND ND ND NO PRE <br /> MW-5 08115/91 6.15 --- - - <br /> MW-5 12/09191 6.15 31.10 -24.95 ND NO NO NO ND -- PRE <br /> MW-5 03109/92 6.15 30.47 -24.32 ND 6.2 ND 0.5 NO PRE <br /> MW-5 06119192 6.15 29.99 -23.84 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 ANA <br /> MW-5 09/18/92 6.15 31.92 -25.77 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 - ANA <br /> QC-1 (e) 09118!92 --- -- - ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 ANA <br /> MW-5 1210M 6.15 32.14 -25.99 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 -- ANA <br /> MW-5 03111/93 6.15 29.48 -23.33 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 - PACE <br /> QC-1 (e) 03/11193 --- -- --- ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 --- PACE <br /> MW-5 06/15/93 6.15 27.45 -21.30 ND<50 ND<0.5 ND<0,5 ND<0.5 ND<0.5 -- PACE <br /> MW-5 09115!93 6.15 27.97 -21.82 ND<50 ND<0.5 ND<0.5 ND<0,5 ND<0.5 -- PACE <br /> MW-5 12122/93 6.15 27.79 -21.64 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 -- PACE <br /> MW-5 04/01/94 6.15 26.91 -20.76 ••. --- <br /> MW-5 07/27/94 6.15 26.96 -20.81 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 2.7 PACE <br /> MW-6 08/05191 5.80 29.82 •24.02 NO ND ND NO ND - PRE <br /> mW-6 08/15/91 5.80 -- --- <br /> MW-6 12!09191 5.80 30.42 -24.62 ND NO ND NO ND --- PRE <br /> MW-6 03/09/92 5.80 29.53 -23.73 NO ND ND ND ND --- PRE <br /> MW-6 06119/92 5.80 29.24 -23.44 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 -- ANA <br /> MW-6 09/18/92 5.80 31.03 -25.23 ND<50 ND<0.5 N0<0.5 ND<0.5 ND<0.5 ANA <br /> mW-6 IZ09192 5.80 31.42 -25.62 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 ANA <br /> MW-6 03/11/93 5.80 28.95 -23.15 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 - PACE <br /> MW-6 06/15193 5.80 26.91 -21.11 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 -- PACE <br /> MW-6 09/15193 5.60 27.29 -21A9 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 PACE <br /> MW-6 12/22/93 5.80 27.17 -21.37 NO<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 PACE <br /> MW-6 04/01194 5.80 26.29 -20.49 -- --- - -._ __ .„- II <br /> MW-6 07/27/94 5.80 26.32 -20.52 ND<50 ND<0,5 ND<0.5 NO<0.5 ND<0.5 3.6 PACE <br /> MW-7 08/05191 6.21 30.82 -24.61 70 19 ND NO NO - PRE <br /> MW-7 08/15/91 6.21 -- --- -- --- -- -- PRE <br /> MW-7 12/09/91 6.21 31.36 -25.15 ND 19 ND 1.2 NO - PRE <br /> MW-7 03109/92 6.21 30.15 -23.94 ND ND ND NO ND -- PRE <br /> MW-7 06119M 6.21 30.19 -23.98 ND<50 ND<0.5 ND<0,5 ND<0.5 ND<0.5 - ANA <br /> MW-7 09/18/92 6.21 31.98 -25.77 90 ND<0.5 ND<0.5 ND<0.5 ND<0.5 ANA <br /> MW-7 12109!'92 6.21 32.33 -26.12 ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 -- ANA <br /> OC-1 (e) 12/09192 - --- - ND<50 ND<0.5 ND<0.5 ND<0.5 ND<0.5 -- ANA <br /> MW-7 03/11/93 6.21 29.85 -23.64 110 3.1 0.8 2.2 1.4 -- PACE <br /> MW-7 06115/93 6.21 27.74 -21.53 71 1.4 0.8 2.8 2.4 --- PACE <br /> QC-1 (e) 06/15/93 -- --- -- 120 1.9 ND<0.5 5.9 4,6 PACE <br /> MW-7 09/15/93 6.21 28.16 -21.95 170 1.2 ND<0.5 5.8 2.5 -- PACE <br /> QC-1 (e) 09/15/93 -- - - 160 1.0 ND<0.5 5.5 2.6 PACE <br /> MW-7 12122/83 6.21 28.03 -21.82 110 1.9 1.3 3.8 10 PACE <br /> MW-7 04/01/94 6.21 27.15 -20.94 340 2.5 1.0 30 43 3.8 PACE <br /> QC-1 (e) 04/01/94 --- -- --- 330 2.6 0.9 28 42 -- PACE <br /> MW-7 07)27194 6.21 27.21 -21.00 72 ND<0.5 ND<0.5 ND<0.5 ND<0.5 2.9 PACE <br /> 14-Sep-94 PAGE 2 <br />