Laserfiche WebLink
1 . <br /> ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> p g <br /> Client:— e Date- L11119q <br /> Alisto Project No: 1�,-b37 Field Personn 1• <br /> Service Station No: 11 l q Address: 1) n <br /> Well IDAW -7field Activity: Well Development I Well Sampling Product Bailing <br /> Casing Diameter: Purge Method: Well Data: <br /> --2 inch (0.16 Gal/foot) Pump (dispos. Poly Tubing) to Product <br /> 3 Inch (0.37 Gal/foot) Disposable Bailers Product Thickness <br /> :4 Inch (0.65 Gal/Foot) _Other *DDepth <br /> Depth to Water <br /> 4.5 Inch (0.$3 Gal/foot) _1.66 PVC Standard Bailer <br /> -6 Inch (1.47 Gal/foot) x.3.50 PVC Standard Bailer <br /> Sampling_Method: Decontamination Method: <br /> Disposable Bailer -Y- Triple Rinse (Liquinox) <br /> Pump Stearn Cleaned <br /> Calculated Pure Volume <br /> Eo ��-I IS =�Z y�°ft X '�Gal/Ft = .I D Gal X — = �� . 30 <br /> Total Depth Depth to Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well DeveIopment/Sampling Parameters <br /> Time Temp I pH I Cond. Purge Turbid- Dissolved Anaiysis Container Preservative <br /> OF (=a'03 <br /> /=) Vol ity Oxygen Required Type <br /> ']} �7 {�} (Gal) <br /> bS !E -C� �p �� -I O 3_ TPH-G/BTEC VOA HCS. <br /> f 3)a 70,7 7,53 l '3" e lI D tj TPH.p;mel Amber Uter Solvent <br /> 131S- O 1 3"70 EPA 601 VOA <br /> 3a o 73G 135-0 �L Q TOG 5520BF Amber Liter Hso, <br /> �. 7.30 1357 13. <br /> V3 S <br />. FORM:Fs3=592 <br />